background image

Check actuator for the following.
  1. Inspect the plastic housing for any dents or cracks. 
  2. Inspect the cables to see if they have been cut or pinched.
  3. See if the actuator appears deflected when fully extended at full load.
  4. Verify that the mounting points do not have any cracks or other defects.
  5. Apply a heavy grease to actuator mounting pins as needed.   

 

 

  6. Verify that the inner or outer tubes do not have any dents, dings,  
      or large scratches in them.

Contact EZ Way’s Service Department if the actuator shows any signs  
of the issues listed above.

               

 

 

 

 

 

 

6. At six month intervals, attach a load equivalent to the rated capacity of the lift to the unit. Raise and  

 

  lower the load with the lift. Listen for any unusual noises while operating the unit. With the test load  

 

  applied to the lift, check all structural welds for any signs of stress or fatigue cracks. If any unusual noises  

 

  or cracks are found, stop using the lift and call the EZ Way Service Department immediately!

7. Test the Emergency Stop Switch. If the switch does not stop the lift when activated, call the EZ Way  
  Service Department immediately!

8. Perform a functional test of the emergency lowering feature of the lift actuator if it is so equipped.

9. Perform a functional test of the anti-pinch feature of the lift actuator. This feature turns the actuator off  

 

  when lowering the lift arm if an obstruction is encountered.

10. Check all the wheels and brakes to make sure they are functioning properly. Hair that gets picked up and    
    wrapped in between wheels should be cleaned out so that the lift will roll easily.

11. Do a visual check for any damaged, missing or loose parts.  Repair as necessary.

12. Check the entire sling for damage or wear, including the loops and stitching.  If damage or wear is  
  present, discard the sling and order a new one.  It is recommended that slings be replaced after one    

 

  year or if the sling shows any sign of damage or wear.

13. When cleaning the lift, do not spray any liquid cleaners directly onto the front panel graphics.  To clean,    
  use a glass cleaner such as Windex, dampen a cloth and wipe the panel.

**IMPORTANT NOTICE**

The SKF Magnetic Runner Actuator used on this unit should be replaced after 4 years or 20,000 double 
strokes (up and down) per the original manufacturer.

It is the responsibility of the purchaser to ensure that regular maintenance inspection is conducted on this 
device by competent staff.

EZ Way, Inc.

1,000 lb. EZ Lift Safety & Maintenance Checklist

Summary of Contents for EZ Light Lift

Page 1: ...nts The sling does not have to be left under most patients The conveniently designed removable battery pack makes bringing a lift to a charger obsolete The EZ Lift comes with two battery packs and a c...

Page 2: ...1000 lbs however users must only lift up to the weight capacity limits of their EZ Lift As patients do vary in size shape weight and temperament these conditions must be taken into consideration when...

Page 3: ......

Page 4: ......

Page 5: ......

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ...Check all bolts to ensure they are tight 3 Check boom to hanger assembly pivot bolt peel rubber back to assure nut is tight and cotter pin is in place Check boom to mast pivot bolt by removing plastic...

Page 14: ...test of the emergency lowering feature of the lift actuator if it is so equipped 9 Perform a functional test of the anti pinch feature of the lift actuator This feature turns the actuator off when low...

Page 15: ...heir location On occasion EZ Way Inc may authorize in house repairs but these repairs MUST be pre approved to avoid invalidation of the warranty Services covered under warranty include any labor that...

Page 16: ...EZ WAY Inc 800 627 8940 712 542 5102 Page 1 of 2 Form 1 082 Rev 01 26 2006 1000 Lift Premier Model L1000PS3 14 5 16 2 17 3 1 9 12 13 15 11 4 7 8 10 6...

Page 17: ...4 13316 Handle Spreader Assembly 5 11871 Battery Pack Assembly UL 6 11920 Cover Base Assembly 1000 lb Lift 7 11885 Caster Rear Lift 1000lb Lift and 800lb Stand 8 13310 Bar Pivot Lift 1000lb 9 11882 Bo...

Page 18: ...nt or client EZ Sling and Harness Laundering Instructions To get the longest life out of your product 1 Do not bleach 2 To prevent stains from setting rinse 5 min in 80 100 F Stains will set when temp...

Page 19: ...n fuse follow the instructions below to lower the patient 1 Position the patient over a bed or chair 2 Grasp red collar on shaft of actuator 3 Turn collar clockwise to manually lower patient 4 Call Se...

Reviews: