EZ-ACCESS PATHWAY HD Installation Supplement Download Page 5

IN 

Installation Supplement for PATHWAY® HD Step Adjustable Leg Kit 

Page 5 of 5 

 

1.7.

 

Using a 3/16″ Allen wrench and a 1/2″ socket or 1/2″ wrench, attach the 

bracket (with leg installed) 

to the riser side rail using 5/16”-18 x 2-1/2” button head socket cap screws, 5/16”-18 locknuts, and 

5/16” flat washers oriented with cap screw and one washer on the riser side and the locknut and a 

second washer on the bracket side (FIG. 1.3). Tighten fasteners securely. 

1.8.

 

Loosen the bracket set screws just enough to allow the leg to contact the ground and support the 

riser. Retighten set screws to 317 in.-lbs. 

 

Do not lean, walk, or otherwise bear weight on the step until installation is complete. 

1.9.

 

Repeat the process for the opposite side of the riser. 

1.10.

 

Install 1-1/2” square tube plugs into the top of each leg. Use a rubber mallet or similar tool to fully 

seat the plug if needed (FIG. 1.4). 

1.11.

 

Complete all remaining steps in the main PATHWAY HD Code Compliant Modular Access System 

Manual and the PATHWAY HD Step Supplement, as required for the system. 

 

2.

 

FINAL CHECKS AND INSPECTION BEFORE USE 

2.1.

 

Ensure all fasteners are in place and secure. 

2.2.

 

Ensure that the level and slope has not shifted during installation. 

2.3.

 

Remove any debris and metal chips. 

2.4.

 

Walk on the assembled system, checking for any undue movement. If undue movement is 

discovered, review the assembly process to ensure no processes were missed. If that does not 

resolve the undue movement, do not use the system and call at 1-800-451-1903 for further 

direction. 

 

FIG. 1.3 

 

 

FIG. 1.4 

 

 

Summary of Contents for PATHWAY HD

Page 1: ...re proprietary and may not be shared modified distributed reproduced or reused without the express written permission of EZ ACCESS 19708 05 08 2020 PATHWAY HD Code Compliant Modular Access System Installation Supplement for PATHWAY HD Step Adjustable Leg Kit Use this Supplement alongside the PATHWAY HD Code Compliant Modular Access System Installation Manual and the Installation Supplement for PAT...

Page 2: ...ion of the equipment manufacturer may void your warranty The symbol may appear in various colors and in conjunction with other symbols and with or without the written word NOTE WARNINGS STEP Uniform Live Load Rating 100 pounds per square foot psf and a concentrated vertical load of 300 pounds over an area of 4 square inches Do not exceed Uniform Live Load Rating PLATFORM Rated Load 100 lb psf live...

Page 3: ...with the end user Fill out online warranty registration IMPORTANT SHIPPING INFORMATION The shipment contains a packing list Confirm all items are present before starting installation Open shipping boxes and inspect for damage or missing parts If damaged or missing parts are noted do not install or use Check for shipping damage immediately upon receipt and note any freight damage on freight bill wh...

Page 4: ...de of riser 1 3 1 Clamp both brackets in place Before drilling holes completed in an upcoming step ensure that no installation issues are noted 1 4 Use a level on each bracket ensuring that it is situated to allow leg to be perpendicular to the ground plane when inserted into the bracket 1 5 Use holes in the bracket as a template to drill 3 8 or 11 32 holes straight through both walls of the riser...

Page 5: ...complete 1 9 Repeat the process for the opposite side of the riser 1 10 Install 1 1 2 square tube plugs into the top of each leg Use a rubber mallet or similar tool to fully seat the plug if needed FIG 1 4 1 11 Complete all remaining steps in the main PATHWAY HD Code Compliant Modular Access System Manual and the PATHWAY HD Step Supplement as required for the system 2 FINAL CHECKS AND INSPECTION B...

Reviews: