Extron electronics AC 102 Installation Manual Download Page 2

68-3360-01 Rev. D

06 21

For information on safety guidelines, regulatory compliances, EMI/EMF compatibility, accessibility, and related topics, see the 

Extron Safety and Regulatory Compliance Guide

 on the Extron website.

© 2019-2021 Extron — All rights reserved.  

www.extron.com

 

All trademarks mentioned are the property of their respective owners.  

Worldwide Headquarters: 

Extron USA West, 1025 E. Ball Road, Anaheim, CA 92805, 800.633.9876 

2

Installing the Assembled Power Module in the Cable Cubby Enclosure

Follow the steps to install and secure the assembled AC power modules for each compatible Cable Cubby enclosure.

NOTE:

  To view the power specifications pertaining to this product, see 

www.extron.com

.

5. 

Position the outlets to the AC 102 or AC+USB 311 
module as shown in figure 3 at right.

• 

Place an outlet into the left slot of the AC 102 
module or the right slot of the AC+USB 311 
module (see figure 3, 

1

). 

• 

Place the other outlet of the AC 102 module 
into the right slot 90 degrees counterclockwise 
(

2

).

6. 

Press each outlet into the slot until the flanges (

3

on opposite edges of the outlet snap into place 
and the outlet is held securely.

240V~ 50-60Hz 10A MAX TOTAL

Figure 3.      

Position and Snap the AC Outlets into the Power Modules

Figure 4.      

Top View of the Power Modules with Israel AC Outlets

Figure 5.      

Installing the AC 102 Power Module in the Cable Cubby 1202 Enclosure

Position the AC outlets and install as shown.

USB CHARGER

240V~ 50-60Hz 10A MAX

N

E

L

240

V~ 

50-60

Hz

 10A MAX TO

TAL

TO

P

240V

~ 50

-60Hz 

10A

 MA

X

US

B C

HA

RG

ER

TO

P

3

1

2

2

2

2

2

3

3

3

3

3

3

Insert the module 

into the Cable Cubby.

1

Secure the module

using four of the provided

pan-head mounting screws

and star washers.

2

AC 102 with Israel Outlets

AC 102

TO

P

Reviews: