Extreme Engineering Operations Manual |
Surface Equipment
Page | 7
Private. Copyright ©
Extre
me Engineering 2012. Unpublished Work. All rights reserved
.
o
120VAC – labeled as 120VAC and has a 3-pin connector
o
220VAC – labelled as 220VAC and has a 4-pin connector
•
ON/OFF
: This is used for both turning the XTR ON and OFF.
Figure 5 XTR Left
8. The XTR has the following ports on the right side:
•
HH ROTC
Hand Held Rotatable connector used to connect the XTR to the XEM tool in order to
program, test, or retrieve data from the tool after the run.
•
EM LOAD
: This is used to place a load onto the tool for testing purposes. This process must
only be done by trained R&M Staff.
•
DEPASSIVATE:
This is used to prepare Lithium batteries for operation after the cell batteries
are installed into the Be-Cu housing. (This process must only be done by trained R&M Staff).