4
14. Put one steel pin through the circular collar on the tensioning
buckle to stop rotation. Use the second steel pin to wind and
tension the cable until the centre pole is 2150mm. Repeat on all
four corners.
13. Use 2 steel pins to tension the steel cables as shown.
IMPORTANT - The cables MUST be tensioned until a
clearance from the centre pole to the ground of 2150mm is
achieved. If the roof is NOT tensioned correctly it will pool
with water when raining and cause the frame to sustain
damage or possibly collapse.
Should concrete weights be used to anchor the marquee,
4 additional straps (purchased separately) should
be used. Put one end on the lug located on the roof
connector and the other end onto the concrete weight. (
check engineers certificate for correct weight. Certificates
are available on the Extreme Marquees website on the
Resources page)