background image

OFFICE LINE

USER MANUAL

UM_EN

Date: 150525_02

R

Summary of Contents for Office series

Page 1: ...OFFICE LINE USER MANUAL UM_EN Date 150525_02 R...

Page 2: ...ser 10 Control Pulser with grinder 11 DIMENSION SKETCH 12 Leva 12 Control Pulser 12 Control Pulser with grinder 13 TRANSPORT 14 Packaging 14 Delivery inspection 14 INSTALLATION 14 Positioning 14 Elect...

Page 3: ...y cleaning 25 Weekly cleaning 25 Cleaning the brewing group and portafilter 26 Cleaning the gasket and shower plate 27 Additional handling of the machine 28 STORAGE AND DISPOSAL OF MACHINE 28 Storing...

Page 4: ...injury and product damage Important Alerts against unsafe practices Observe Important notifications to ensure food safety prevent possible minor personal injury or damage to the machine WARNING Indic...

Page 5: ...l carefully before starting to use the machine This manual contains important instructions regarding safe intended use of the machine Do not discard this manual it will be useful for future reference...

Page 6: ...performance install the machine in a location where these parameters will not be exceeded Maximum permissible inlet water pressure 600 KPa 6 Bar Minimum permissible inlet water pressure 200 KPa 2 Bar...

Page 7: ...SPECIFICATIONS MODEL Leva 1 boiler Leva 2 boilers Steam wand 1 unit Hot water outlet 1 unit Group 1 unit Built in grinder No Temperature control Pressurestat regulated Pressurestat PID regulator Widt...

Page 8: ...ume L 1 5 1 5 Water tank volume L 2 75 2 75 Power supply options 120V 1200W 60Hz 120V 1310W 60Hz 240V 1950W 60Hz 240V 2050W 60Hz Water connection Female 3 8 thread Female 3 8 thread Machine weight 37...

Page 9: ...oiler switch 3 Steam wand 10 Hot water tap 4 Porta filter 11 Brewing lever 5 Removable drip tray 12 Steam manometer 6 Adjustable leg 13 Temperature control display 7 Hot water outlet 14 Brew manometer...

Page 10: ...tap 7 Hot water outlet 2 Brewing group 8 Heating element light 3 Steam wand 9 Main switch 4 Porta filter 10 Hot water tap 5 Removable drip tray 11 Brewing switch 6 Adjustable leg 12 Electronic control...

Page 11: ...ser with grinder Control with grinder POS Description POS Description 1 Steam tap 7 Hot water outlet 2 Brewing group 8 Heating element light 3 Steam wand 9 Main switch 4 Porta filter 10 Hot water tap...

Page 12: ...OFFICE LINE 12 DIMENSION SKETCH Model A B C Leva Leva 2 boiler 260 mm 460 mm 430 mm Leva A C B Model A B C Control Pulser 250 mm 420 mm 410 mm A C B Control Pulser...

Page 13: ...OFFICE LINE 13 DIMENSION SKETCH Control Pulser with grinder Model A B C D Control with grinder 420 mm 460 mm 560 mm 680 mm Pulser with grinder 420 mm 460 mm 560 mm 680 mm A C D B...

Page 14: ...he manufacturer or dealer immediately Damage caused during transport should be reported to the shipping agent and the machine s distributor immediately Packaging materials are potentially dangerous an...

Page 15: ...untry of installation Ensure that a circuit breaker engineered for the power consumption of the machine is installed to protect the domestic electrical supply as specified on the ratings plate located...

Page 16: ...the value is higher lime scaling inside the boiler will occur In both cases the proper function of the machine and quality and taste of the coffee will be negatively affected If necessary connect the...

Page 17: ...er max volume 2 75L Avoid spills inside the machine Replace the top panel cup warming tray When the boiler is filled and heated the machine is ready for use DANGER Avoid spills inside the machine If s...

Page 18: ...er mains connection Starting the machine Fill the water tank or open the water mains supply valve Turn on the main power switch Press a drink button at the control panel or raise the group lever then...

Page 19: ...nel Portafilter filter basket for double espresso 14g Align the portafilter s two flanges with the two slots in the group housing Insert the portafilter and rotate it counterclockwise until the handle...

Page 20: ...spouts Select the desired option from the drink buttons or raise the group lever Insert the filled portafilter into the group head and lock it into the correct position Fill the filter basket of the p...

Page 21: ...mperature close the tap and remove the pitcher Immerse the steam wand into the milk making sure the wand tip is submerged After the process is finished position the steam wand over the drip tray and o...

Page 22: ...ious burns ESPRESSO MACHINE WITH BUILT IN GRINDER Before using the coffee grinder Pos PART NAME 1 BEAN HOPPER LID 2 BEAN HOPPER 3 BEAN STOP 4 GRINDING ADJUSTMENT DISK 5 COFFEE TAMPER 6 GRINDER POWER S...

Page 23: ...ompact the coffee For a finer grind Hold down the grinder trigger while slowly rotating the adjuster to the right When the desired grind is achieved release the trigger For a courser grind Hold down t...

Page 24: ...for 10 minutes The hose does not need to be disconnected After recharging remove the water softener unit and dry the outside with a clean cloth The water inside the unit may remain Replace the water...

Page 25: ...ainer under the water outlet and dispense water for 10 seconds dispose of this water Daily cleaning Weekly cleaning Clean the brewing group and portafilter with professional cleaning powder see page 2...

Page 26: ...ply raise the brew lever for 5 intervals of 10 seconds each Cleaning membrane Espresso machine detergent Note Only use professional cleaning powder for espresso machines It s available from your distr...

Page 27: ...nuous Dispensing button for Control machines or press the brew button for Pulser machines For Leva machines raise the brewing lever for 15 seconds Make an opening closing movement of the portafilter i...

Page 28: ...onnect and roll up the power cord this should be performed by a qualified person Disconnect the machine s water inlet hose from the domestic water supply and drain the boilers this should be performed...

Page 29: ...s only PROGRAMMING 1 Long Espresso 1 Short Espresso 2 Short Espresso Auto cleaning Programming Continuous Dispensing 2 Long Espressos Press the Continuous Dispensing button for 4 seconds it will begin...

Page 30: ...tart to cool down To connect the thermostat If the thermostat is OFF press either the or button The thermostat will be turned back on and the group s current temperature will be displayed as the group...

Page 31: ...stem displays the PrS message Turn the machine off and on again at the power switch to restart the thermostat If the temperature gauge in the group s boiler has short circuited the system will display...

Page 32: ...steam wand does not dispense steam The steam wand is clogged by milk Clean the wand and if necessary remove the nozzle and unclog it using a pin or needle Water is found underneath the machine The dr...

Page 33: ...ting service if there is any risk that the damage or defect could worsen The warranty shall not cover consumable supplies such as glassware or normal maintenance such as cleaning of filters Additional...

Reviews: