Maintenance
Adjustments
Note:
Disengage PTO, shut off engine, wait for
all moving parts to stop, engage parking brake, and
remove key before servicing, cleaning, or making any
adjustments to the unit.
CAUTION
Raising the mower deck for service or
maintenance relying solely on mechanical
or hydraulic jacks could be dangerous. The
mechanical or hydraulic jacks may not be enough
support or may malfunction allowing the unit to
fall, which could cause injury.
Do Not rely solely on mechanical or hydraulic
jacks for support. Use adequate jack stands or
equivalent support.
Deck Leveling
1. Position the mower on a flat surface.
2. Stop engine, wait for all moving parts to stop, and
remove key. Engage parking brake.
3. Check the tire pressure in the drive tires. Proper
inflation pressure for tires is 13 psi (90 kPa).
Adjust if necessary.
4. Position the transport lock in the latching
position.
5. Push the foot pedal all the way forward and the
deck will latch at the 5 1/2 inch (14 cm) transport
position (Figure 26).
Figure 26
1.
Foot lever
3.
Transport lock
2.
Height of cut pin
6. Insert the height adjustment pin into the 3 inch
(7.6 cm) cutting height location.
7. Release the transport lock and allow the deck to
lower to the cutting height.
8. Raise the discharge deflector.
9. Measure from the level surface to the front tip of
the center blade. The measurement should read
3 inches (7.6 mm).
Note:
In most conditions, the back blade tip
should be adjusted 1/4 inch (6.4 mm) higher than
the front.
Figure 27
1.
3 1/4 inches (8.3 cm)
4.
3 inches (7.6 cm)
2.
Back blade tip
5.
Level surface
3.
Front blade tip
10. Loosen the jam nuts on the top of each deck
link. Fine tune the adjuster on the front deck lift
assembly by turning it to get 3 inch (7.6 mm)
height (see Figure 28).
To increase the height, turn the adjuster clockwise;
to decrease, turn counterclockwise.
40
Summary of Contents for LAZER Z LZS22KA484
Page 1: ...LAZER Z S SERIES For Serial Nos 920 000 Higher Lazer Z LZS Units Part No 4500 728 Rev A ...
Page 12: ...Safety 107 2102 109 3148 109 7232 1 Fast 3 Neutral 2 Slow 4 Reverse 109 7330 109 7929 12 ...
Page 57: ...Schematics Hydraulic Diagram 57 ...
Page 59: ...Notes 59 ...
Page 60: ...Notes 60 ...
Page 61: ...Service Record Date Description of Work Done Service Done By 61 ...
Page 62: ...62 ...