Product Overview
the deck creating a gap at the front, use the steps
below to install a shim. If the gate link frame
has complete contact all around the discharge
opening, the shim is not necessary. It can remain
in the storage position for potential later use on
other mower decks.
1.
Remove the shim located on the front of the
gate link frame and loosely reinstall the nut.
2.
Loosen the nut on the left adjustment slot of
the gate link frame.
3.
Install the shim between the gate link frame
and the pivot mount assembly. Position
the center tab of the shim between the two
mounting bolts as shown in Figure 8.
4.
Tighten hardware.
1.
Pivot the assembly towards the deck. The front
pin should engage into the slot in the deck as
shown in Figure 9.
g020069
Figure 9
1.
Latch
3.
Front pin
2.
Operator Controlled
Discharge accessory
assembly
4.
Slot
2.
Rotate the latch downward to lock the assembly
in this position (reference Figure 9). Adjust the
tension on the latch to hold the assembly up to
the deck, yet allow for release by hand. Tension
can be adjusted by tightening or loosening the
hardware that retains the latch.
Product Overview
g220320
Figure 10
1.
Handle
2.
Discharge gate (under discharge deflector)
3.
Discharge deflector
11