![Exmark 135-0192 Operator'S Manual Download Page 11](http://html1.mh-extra.com/html/exmark/135-0192/135-0192_operators-manual_2450867011.webp)
Setup
g213563
Figure 5
1.
Aerator 30 side bracket
5.
5/16-18 x 1 inch carriage
bolt
2.
1/4-20 x 5/8 inch hex
screw
6.
Reuse nut
3.
1/4 inch flanged nyloc
nut
7.
1/4-20 x 1 inch carriage
bolt
4.
Aerator 24 side bracket
8.
1/4 inch flanged nyloc
nut
4
Installing the Control Cable
Parts needed for this procedure:
Procedure
1.
Making sure the cable ball joint is securely
attached to the cable, connect it to the control
arm and secure with a washer and 1/4–28 inch
nyloc nut as shown in Figure 6.
g221603
Figure 6
1.
Cable ball joint
5.
Knob
2.
Control lever
6.
Washer
3.
1/4–28 inch nyloc nut
7.
Jam nut
4.
Cable mount bracket
2.
Loosen the knob and slide the control cable into
the notch of the mount bracket and tighten the
knob.
3.
Route the other end of the control cable to the
gate arm.
g213569
Figure 7
1.
1/4-28 inch nyloc nut
4.
Cable end
2.
Washer
5.
Hopper bracket
3.
Gate arm
4.
Insert the cable end into the hole of the gate arm;
secure the cable end with a washer and 1/4-28
inch nyloc nut (see Figure 7).
11