Curtiss-Wright | GSM Series Rev. U PN29959 3/28/17
21
2. Remove the O-ring from the O-ring groove located inside the
opening from which the seal was just removed.
3. Replace the O-ring with the O-ring supplied with the new main
rod seal gland.
4. Taking care not to touch the seal material to any sharp rod
features such as threads, slide the seal gland on to the actuator
rod and to the face plate.
5. Using the appropriate gland and spanner wrench, tighten the
seal to the proper torque level indicated in the previous table.
5.0 CLASS 1 DIVISION 2 OPTION
Class 1 division 2 products are provided with an electrical box
containing terminal blocks for wiring. The electrical box has two NPT
ports for customer conduit connection. It is the responsibility of the
installer to insure that the interconnecting wire, cabling and conduit meet
any local or regional required electrical codes and standards.
Summary of Contents for GSM20
Page 27: ...Curtiss Wright GSM Series Rev U PN29959 3 28 17 27 7 0 CERTIFICATIONS...
Page 29: ...Curtiss Wright GSM Series Rev U PN29959 3 28 17 29...
Page 30: ...Curtiss Wright GSM Series Rev U PN29959 3 28 17 30...
Page 31: ...Curtiss Wright GSM Series Rev U PN29959 3 28 17 31...
Page 32: ...Curtiss Wright GSM Series Rev U PN29959 3 28 17 32...
Page 33: ...Curtiss Wright GSM Series Rev U PN29959 3 28 17 33...
Page 34: ...Curtiss Wright GSM Series Rev U PN29959 3 28 17 34...