Once the AC and DC wiring have been installed and connected, take a moment to
go re-examine all the connections and make sure they are secured and in the
proper terminals.
1.
Check to see that the Exide Inverterz is turned off and then apply battery
(DC) power to it. Ensure that all wiring has been installed properly. Next turn
On the battery bank DC disconnects or connect the proper fuse in line to the
battery to compete the battery circuit.
2.
Put ON/OFF switch to the ON position. This system should run a load
without AC input (battery only). Place a load on the system and make sure it
works.
3.
To charge your batteries connect AC power to the system by lugging in the
AC power and turning on the mains line. This shows that charger is working
properly. Any AC load powered by the system should also work at this point
since a portion of the AC power is passed through this Exide Inverterz to
power the loads.
4.
Disconnect the AC power the system should transfer to battery mode
immediately. This will be indicated by clicking sound as the internal transfer
relay changes position.
5.
The system will begin to take power from the batteries and use it to power
the load. And the load continues to operate uninterrupted.
The above steps will complete the functional test of the Exide Inverterz. If all areas
pass, the system is ready for use. If something fail figure out the reason before
proceeding or contact the service centre
Note:
Manual / Bypass switch selection should be manual mode, if Inverterz faulty,
than select Bypass selection.
Very little maintenance is required to keep your Exide Inverterz Magic operating
properly. You should clean the exterior of the unit periodically with a damp cloth to
prevent accumulation of dust and dirt
Start Operation
Maintenance