For equipment certified for use in hazardous areas reference should be made to EN60079-17 
(especially table 1) in addition to the following recommendations. 

6.5.1 3 

Monthly 

a.  Generally inspect the equipment for external damage. 

b.  Ensure that the spaces between the element fins remain clear and that the airflow 

remains unrestricted. 

6.5.2 6 

Monthly

 

a.  Isolate the electrical supply and remove the cover. 

b.  Internals should be clean and dry. 

c.  Ensure terminals are intact and secure. 

d.  Heating element insulation resistance to be at least 2 megohm. 

e.  Refit cover with new gasket or ‘o’ ring if required. 

f.  HFT only – check the flamepath gap as 3.7 above. 

g.  Earth continuity must be maintained between all points and the main structure. 

6.5.2 Annually

 

a.  Carry out 3 monthly and 6 monthly check as above. 

b.

 

Check for element failure or low insulation resistance. 

6.6 

FAW and FAW-C heaters - only Heatex Ltd or its approved agent to carry out heating 
element replacement otherwise the Hazardous Area certification will be invalidated. 

6.7 

If heaters are being left unused for a period greater than 3 months, carry out 6 monthly 
maintenance before energising. 

7.0 MARKING

 

7.1 

FAW, FAW-C and FCR 

 

 II 2 G 

 

EEx e II T(2, 3 or 4 depending on model) 

7.2 HFT 

 

 II 2 G/D 

 

EEx d IIC T6 IP6X T85ºC 

 

Summary of Contents for HEATEX FAW

Page 1: ...MAINTENANCE INSTRUCTIONS FOR HEATEX FAW FAW C AND STW TYPE AIR WARMERS FCR TYPE CONVECTORS AND HFT TYPE AIR THERMOSTATS Please read these instructions thoroughly before installation and ensure they a...

Page 2: ...n must be observed 1 11 The heater should be securely fixed in position and all terminal connections checked for tightness before energising 1 12 Any modification not carried out by Heatex Limited or...

Page 3: ...entation as the elements and on the corner of the HFT terminal box 4 2 The internal earth connection is to one end of the terminal rail FAW and FAW C or via a pillar STW and HFT inside the terminal bo...

Page 4: ...least 2 megohm e Refit cover with new gasket or o ring if required f HFT only check the flamepath gap as 3 7 above g Earth continuity must be maintained between all points and the main structure 6 5...

Page 5: ...UNIT INTERNAL EARTH CLIENTS INCOMING SINGLE PHASE EARTH SUPPLY L N WIRE LINK REMOV ABLE WIRE LINK AUTO RESET CONTROL THERMOSTAT WHEN FITTED REMOVE WIRE LINK BETWEEN TERMINALS 3 4 E HEATER UNIT EXTERNA...

Page 6: ...SUPPLIED WIRED FOR SINGLE PHASE OPERATION WITH WIRE LINKS BETWEEN TERMINALS 2 3 4 5 FOR 3 PHASE NEUTRAL OPERATION ALL WIRE LINKS MUST BE REMOVED COPPER LINKS DUAL SUPPLY SINGLE PHASE or 3 PHASE 4 WIR...

Page 7: ...NALLY MOUNTED HFT TYPE AUTO RESET CONTROL THERMOSTAT 1 2 CLIENTS OPTIONAL CONTROL CONNECTION NOTE 5 ELEMENT TYPE UNIT SHOWN FOR ELEMENT QUANTITIES OF 1 2 or 4 IGNORE THE RELEVANT NUMBER OF ELEMENTS L...

Page 8: ...MAKE ON RISE CLIENTS NEUTRAL CONNECTION CLIENTS CONTROL CONNECTIONS HFT SERIES THERMOSTAT WIRING DIAGRAM HEATER ELEMENT L N HEATER UNIT INTERNAL EARTH SINGLE PHASE STW SERIES HEATER WIRING DIAGRAM CL...

Page 9: ...CLEATS FEEDER PILLARS FUSE LINKS ARC FLASH CABLE ROLLERS CUT OUTS 11KV 33KV CABLE JOINTS CABLE TERMINATIONS FURSE EARTHING www cablejoints co uk Thorne and Derrick UK Tel 0044 191 490 1547 Fax 0044 19...

Page 10: ...10 This page intentionally left blank...

Page 11: ...11 This page intentionally left blank...

Page 12: ...CLEATS FEEDER PILLARS FUSE LINKS ARC FLASH CABLE ROLLERS CUT OUTS 11KV 33KV CABLE JOINTS CABLE TERMINATIONS FURSE EARTHING www cablejoints co uk Thorne and Derrick UK Tel 0044 191 490 1547 Fax 0044 19...

Reviews: