background image

Product Information

EXHAUSTO Inc.

1200 Northmeadow Pkwy.

Suite 180

Roswell, GA 30076

P: 770.587.3238

F: 770.587.4731

T: 800.255.2923

[email protected]

us.exhausto.com

3912044   09.08

V E N T I N G   D E S I G N   S O L U T I O N S

Specifications

Sequence of Operation

The fan or power venter is turned on by a switch.
Once the chimney fan or power venter has 
generated enough draft to satisfy the draft set-
point, the appliance’s gas-valve is released and 
the heating appliance allowed to operate.  To turn 

the system off, flip the switch to the OFF position. 

This will close the gas valve and shut down the 
heating appliance.  However, the fan or power 
venter will operate for up to 3 minutes to remove 

residual flue gas products in the chimney system.

If proper draft is not maintained (because of wind 
pressure or other pressure disturbance), the control 
will gradually increase the speed of the fan until 
proper draft is achieved.  If the increased speed 

does not provide sufficient draft, the control will 

automatically shut down the appliance by turning off 
the gas valve.

EBC10-P

EBC10-E

A

B

C

EBC 10 Control

Power supply

V

1x120VAC

Amperage

A

6.3

Operating temperature

°F/°C

-4 to 122 / -20 to 50

Control signal

mA

max. 10

Control relay

Max. 120 VAC / 8A 

Output

VAC

10-120

VDC

0-10

Dimensions

A in/mm

7.17 / 182

B in/mm

7.09 / 180

C in/mm

4.37 / 111

Weight

lbs/kg

3.0 / 1.5

Chimney Probe

Dimensions

D in/mm

4.25 / 108

E in/mm

3.50 / 89

D

E

NorthlineExpress.com

http://www.northlineexpress.com

Toll-Free 1-866-667-8454

Reviews: