6. Right and Left Foot Bar Sets Installation
Remove the tape from the joint of the Right Handrail Arm (4).
Insert the Right Handrail Arm (4) all the way onto the horizontal axle of the
Front Post (2) and secure the Right Handrail Arm (4) in position with one
M8x16mm Hexagon Head Bolt (47) and one 5/16"x20x2.0T Washer (48).
Tighten bolt with the Hex Tool with Phillips Screwdriver provided.
Remove the tape from the joint of the Right Rotate Bar (8).
Insert the Right Rotate Bar (8) onto the Crank (11) axle. The Rotate Bar
Wheel (81) has to be placed on the U Shape Rail Aluminum Plate (105).
Secure the Right Rotate Bar (8) in position with one M8x16mm Hexagon
Head Bolt (47) and one 5/16"x20x2.0T Washer (48). Tighten bolt with the
Hex Tool with Phillips Screwdriver provided.
Untie the wire and remove two Ø14x20x2T Plastic Washers (83) from the
bottom end of the Right Handrail Arm (4). Place two Ø14x20x2T Plastic
Washers (83) back onto the joint of the Right Handrail Arm (4).
ASSEMBLY
15
(47) Hexagon Head Bolt
M8x16mm
1 PC
(48) Washer
5/16"x20x2.0T
1 PC
4
83
83
Untie the
wire.
Remove the
wire and
Plastic
Washers (83).
Place two Plastic
Washers (83) back onto
the joint of the Right
Handrail Arm (4).
CAUTION: MAKE SURE
THE BUSH (82) WAS
PERFECTLY IN POSITION
BEFORE SECURING THE
BOLTS.
(47) Hexagon Head Bolt
M8x16mm
1 PC
(48) Washer
5/16"x20x2.0T
1 PC
Summary of Contents for Pro Stride 23
Page 4: ...3 LABEL PLACEMENT...