DUCTING
1. Remove all tape from the ducts, butterfly valves and ensure they move up and down freely.
2. Position the butterfly valves up.
3. Position the ducting over the top of the collection box and butterfly valves.
4. Using a Range hood installer duct through the ceiling and roof in accordance with local, state
and national regulations and laws.
POWER
If required, have a power point socket installed onto the ceiling next to the ceiling bracket. Allow
at least 100mm from the ceiling bracket. The position of the 240V AC ceiling socket is that it must
be accessible to turn off without removing any covers.
Note: All electrical work must be
carried out by a licenced electrician.
1. Uncoil power cord
2. Plug into ceiling socket and turn on.
3. Test the fans and lights work
4. If all okay turn off ceiling socket and unplug power lead.
FLUE SURROUND
Provided are 2 x flue surrounds both 400mm high. These are used to finish and cover the motor
box and installed ducting. You have already installed these to your range hood.
1. Slide the inner flue surround up as high as possible and secure with screws, ensuring not to
damage the power cord.
2. Push 240V AC plug into power socket and turn on.
Note: Please only temporarily fix flu covers, so if service is required motors and electrical
components can be accessed.
RANGEHOOD INSTALLATION
Summary of Contents for CXWB12082
Page 2: ...Page 2 ...
Page 14: ...Page 14 CXWB12082 RANGEHOOD ...
Page 16: ...Page 16 ...
Page 21: ...Page 21 ...
Page 25: ...Page 25 CXWB12062 CXWB12082 ...