INSTALLATION
2
2.1 Before installing the inlet air supply hose, ensure that the airline is free of any
contaminants by sufficiently blowing out the line prior to connection.
A filtered air supply is recommended. The supply pressure should not exceed
175 psi.
2.2 Secure the inlet and outlet hoses to the connectors with hose clamps.
2.3 Fasten the gauge via the provided mounting holes to a suitable surface with
appropiate anchors.
2.3 Connect the power cord to a suitable electrical receptacle.
INLET
OUTLET