ES2030 CV
Display and modification of the basic settings
18
Starting on real time clock
A regeneration can be started depending on the real time clock. There is the
possibility for programming two starting times at one day.
Select the day(s) for starting regeneration of the unit in service at the time
programmed in step 6.8 ( “-“ = not activated; “|” = activated).
Enter the time at which the unit in service will go into regeneration.
Select the day(s) for starting regeneration of the unit in service at the time
programmed in step 6.10 ( “-“ = not activated; “|” = activated).
Enter the time at which the unit in service will go into regeneration.
7. Interval start of regeneration
Regenerations can also be initiated at fixed intervals. This periodic initiation is
selected where a water meter is not necessary because the amounts of water
drawn off are constant.
It is also used to prevent micro organism formation where there would be
excessive standby periods in the context of flow dependent or quality dependent
initiations.
NOTE: In systems with salt solution containers you must wait for brine formation to
take place. I.e. in that case the interval before the next regeneration should be at
least 4 hours.
An interval between 1 and 999 hours can be entered.
Step no.: 7.1
Interim startY/N
Step no.: 7.2
Period 72h
Step no.: 6.6
Timestart Y/N
Step no.: 6.8
Starttime 00:30
MoTuWeThFrSaSu
- - - - - - -
Step no.: 6.10
Starttime 05:00
MoTuWeThFrSaSu
- - - - - - -
Yes No
6.6
6.*
Period
h
7.2
8.1
Yes No
7.1
Mo Tu
Fr
6.7
We Th
Sa Su
Starttime
:
6.8
Mo Tu
Fr
6.9
We Th
Sa Su
Starttime
:
6.10
7.1
8.1
Summary of Contents for ES2030 CV
Page 34: ...ES2030 CV Wiring diagram 31...