IONPURE
®
DC POWER CONTROLLER
– IP-POWER600-G2
IP-POWER600-G2 MAN REV. 11
Page 14 of 28
3
Operation
3.1
Initial Startup
The startup sequence depends on the design of the CEDI system. Please consult the Operation
Manual for the CEDI system.
3.1.1
Example of Initial Startup Procedure
The following startup procedure is only an example for a typical single module CEDI system
with an electrical schematic as shown in Figure 3.
1. Close the main disconnect switch (or circuit breaker) for the CEDI system.
2. Open the appropriate valves and start the pretreatment equipment, such as the reverse
osmosis (RO) system, upstream of the CEDI system.
3. Adjust the flow rates of the dilute and concentrate streams through the module.
4. Slowly increase the DC output current to the value calculated by the Ionpure
Performance Projection Program (Current Startup Calculator). The power controller will
maintain the current at that setting if the required voltage to drive the current is lower
than the maximum DC voltage available.
5. Verify that the DC output is removed when the CEDI module flow is interrupted.
Operation with DC power on and insufficient water flow can cause
irreparable damage to the CEDI module(s) and system.
During normal operation, no further attention to the DC power controller should be required.
3.2
Output Adjustment
The DC output current may need to be adjusted if there is a change in feed water conditions and/or
flow rate.