evolvefurnituregroup.com
5
Evolve Customer Support available at 856.552.4000, 888.827.2500, from 8:30 am - 5:30 pm Eastern time, or fax at 856.552.4001.
POWER BEAM INSTALLATION GUIDELINES
Power Distribution Housing
STEP 1: Insert the power distribution housing at an angle with the tabs facing down,
into the corresponding slots. Push it in until it clicks.
STEP 2: Position the receptacle into the mounting bracket on the power distribution housing.
There is an arrow and letter “N” to indicate which way is up.
STEP 3: Slide it towards the assembly connectors. Be sure the parts are fully seated to assure
proper electrical connection and the spring clips are properly engaged for mechanical security.
1
2
3