17
www.evolutionpowertools.com
FR
ES
EN
(>9.15) ASSEMBLY AND PREPARATION
(>9.18) TESTING
WARNING:
This machine has CLASS 1 insulation and MUST
be earthed. Any power socket that this machine is connected
to must be grounded to earth. Ensure that both operating
switches are in the ‘OFF’ position before connecting the power
cord to the socket.
WARNING:
The power cord assembly is a custom terminated
one. Replacement should only be carried out by a qualified
technician. Only use replacement parts recommended by
Evolution Power Tools.
(<9.18)
• Place the machine onto a piece of clean 10 mm thick mild steel
plate that is larger than the magnetic base of the machine.
• Connect the plug into a mains supply socket.
• Switch on the socket (UK only).
• Operate the red rocker switch on the machine’s switch panel
to energise the magnet.
(Fig. 4a)
• Operate the green push switch
(Fig. 4b)
on the machine’s
switch panel to switch on the motor and the Red push
switch to switch off the motor.
(Fig. 4c)
• Allow the motor to run for a few seconds to check for any
unusual noise or vibration.
• Do not use the machine if any vibration or unusual noises
are detected or if magnetic adhesion is questionable. Have
the machine serviced by a qualified person, or if under
warranty refer to the guarantee agreement.
• Turn ‘OFF’ the machine when all testing has been completed.
FIG. 4a
FIG. 4b
FIG. 4c
Summary of Contents for BORA 2800
Page 2: ......
Page 3: ...FR ES EN ENGLISH Original Instructions...
Page 23: ...23 www evolutionpowertools com FR ES EN NOTES...
Page 24: ......
Page 25: ...FR ES EN ESPA A Traducci n de las instrucciones originales...
Page 47: ...47 www evolutionpowertools com FR ES EN NOTAS...
Page 48: ......
Page 49: ...FR ES EN FRAN AIS Traductions d instructions originales...
Page 71: ...71 www evolutionpowertools com FR ES EN NOTES...