INSTALLATION INSTRUCTIONS
A f f i n i t y 3 0 G e
Evo, Inc. | 8140 SW Nimbus Ave., Bldg 5 | Beaverton, Oregon 97008 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | [email protected]
10
271932"
701.04mm
2734"
704.85mm
11532"
37.16mm
R1818"
460.38mm
1318"
333.38mm
262332"
678.51mm
131316"
350.52mm
STEP 2:
Mark the fi nished position of the Evo Affi nity 30Ge drip pan on the countertop using
the dimensions shown. The circular dimension of 18-1/8” is the diameter of the drip pan to the
outside fl ange material thickness (located to the inside of the half-rolled bead edge). The drip
pan cutout must be made precisely to these dimensions (or at a m1/16”) so that the
half-rolled top bead on the drip pan edge overhangs the cutout dimension by .25”.
(
See following page for more detail)
Countertop with
substrate underlayment
OPENING IN COUNTERTOP FRONT
Countertop
overhang to
cabinet front
Cabinetry Box:
minimum 3 cm
below countertop
surface
TOP VIEW
COUNTERTOP INSTALLATION (1 of 4)
NOTE:
If the dimensions for the
countertop overhang and
countertop depth cutout
are not followed, there
will be a confl ict with the
door swing which allows
access to the waste
containers.