Evo 11-0126-ATK Assembly & Installation Manual Download Page 1

R

ASSEMBLY & INSTALLATION MANUAL

T r i m   K i t   f o r   E v o   A f f i n i t y   2 5 G

Evo, Inc., 20560 SW 115th Ave., Tualatin, OR 97062 USA

Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | [email protected]

Trim Kit for Evo Affi

  nity 25G 

( Shown installed to granite topped cabinet ) 

Copyright © 2019

Summary of Contents for 11-0126-ATK

Page 1: ...Kit for Evo Affinity 25G Evo Inc 20560 SW 115th Ave Tualatin OR 97062 USA Phone 503 626 1802 Fax 503 213 5869 www evoamerica com support evoamerica com Trim Kit for Evo A nity 25G Shown installed to g...

Page 2: ...IONS AND WARNINGS CONTAINED IN THIS MANUAL CAUTION POTENTIALLY SHARP METAL EDGES IF NOT AVOIDED MAY RESULT IN MINOR OR MODERATE INJURY Notes Complete Now For Future Reference Date Purchased __________...

Page 3: ...finity 25G Evo Inc 20560 SW 115th Ave Tualatin OR 97062 USA Phone 503 626 1802 Fax 503 213 5869 www evoamerica com support evoamerica com 3 3 3 INSTALLATION CHECKLIST TRIM KIT COMPONENTS 4 TRIM KIT DI...

Page 4: ...Trim Kit Metal Parts 1 Top Pan 2 Support Beam 2 End Cap 1 Left 1 Right 1 Center Panel 11 Universal Mounting Brackets pre installed Qty Hardware Bag For Trim Kit Assembly 8 1 4 20 x 1 2 SS Screw 8 1 4...

Page 5: ...Affinity 25G Evo Inc 20560 SW 115th Ave Tualatin OR 97062 USA Phone 503 626 1802 Fax 503 213 5869 www evoamerica com support evoamerica com 5 TRIM KIT DIMENSIONS 5 5HFRPPHQGHG RSHQLQJ 5HFRPPHQGHG RSH...

Page 6: ...0 SW 115th Ave Tualatin OR 97062 USA Phone 503 626 1802 Fax 503 213 5869 www evoamerica com support evoamerica com 6 TRIM KIT DIMENSIONS HQG 5DGLXV 6KLP DS HQG 5DGLXV FRONT VIEW DIMENSIONS TOP VIEW DI...

Page 7: ...evoamerica com support evoamerica com 7 STEP 1 Prepare cabinet construction using either wood or steel framing It is recommended to have a cutout measuring 29 1 8 depth by 34 1 5 width by 9 5 8 height...

Page 8: ...ge Center Panel Front Edge End Cap Support Beam Outside Edge Fasten Support Beam and Center Panel to End Cap using 1 4 20 x 1 2 SS Phillips Head Screw with Nyloc Nut STEP 2 Locate Support Beam and Cen...

Page 9: ...3 Check dimensions of frame construction t by placing assembled Trim Kit base into prepared cabinet Mark location for Back Wall Brace Align Support Beam to marked position of Back Wall Brace and chec...

Page 10: ...Nut Turn all eleven 11 Universal Mounting Brackets to vertical position STEP 5 Fasten Top Pan to End Cap using four 4 1 4 20 x 1 2 SS Phillips Head Screw and Nyloc Nuts as shown Next shim level and re...

Page 11: ...unting brackets with 7 16 Open End Box Wrench installed on Evo A nity 25G Cooktop STEP 7 To install the Evo cooktop into the assembled and installed Trim Kit follow the installation instructions in th...

Reviews: