background image

Sub Step 1.  Fill hollow Base (01) with either sand or water (approx 250lbs of water or approx 370 lbs of sand).
Sub Step 2.  Align using the round and square notches and attach the Neck Plate (02) to the Base (01) using 8 Flat Washers (05), 
                    8 Lock Washers (04), and 8 Bolts (03) as shown in Diagram 2. Tighten bolts loosely by hand until all are in place, then 
                    go back and re-tighten securely with Allen Wrench.
Sub Step 3.  Attach the Flex Neck (06) to the Neck Plate (02) using 8 Flat Washers (05), 8 Lock Washers (04), and 8 Bolts (03)
                    as shown in Diagram 3. Tighten bolts loosely by hand until all are in place, then go back and re-tighten securely with Allen Wrench.
Sub Step 4.  Screw Connecting Pole (07) into Flex Neck (06) as shown in Diagram 4. 

Items needed step 2:

No.

                    

Description Qty.

09       

            

Connecting Tube 

1

10       

            

Shell 

1  

11       

            

Main Foam Section

             

1     

12      

             

Foam Centre Plug 

13       

            

White Foam Ring         

       

1  

14      

             

Black Foam Ring 

1

STEP 1: BASE CONSTRUCTION

Sub Step 1.  Insert  Foam Centre Plug (12) into the Main Foam Section (11), pushing all the way to the bottom.
Sub Step 2.  Insert White Foam Ring (13) into Shell (10), this is best accomplished by putting the ring in at an angle, 
 

then pulling the Shell (10) up around it.

 

Sub Step 3.  Insert Black Foam Ring (14) into Shell (10), this is best accomplished by putting the ring in at an angle, 
 

then pulling the Shell (10) up around it.

 

Sub Step 4.  Close Shell (10) lid and zip closed. 
Sub Step 5.  Insert Connecting Tube (09) into Shell (10), to complete Heavy Bag Tube.

STEP 2: HEAVY BAG CONSTRUCTION

Items needed for step 1:

No.

 

Description Qty.

01 Base 

02 

Neck Plate 

1    

03 

Bolts 

16     

04 

Lock Washers 

16       

05   

Flat Washers 

16      

06    

Flex Neck with PTR

 

1         

07  

Connecting Pole 

1         

08 

Adjusting Pole 

1       

15 

Allen Wrench 

1        

Diagram 1

Diagram 2

Diagram 4

02

03

04

05

01

Diagram 3

03

04

05

01

01

01

07

12

10

11

10

11

13

13

14

10

11

09

13

14

10

11

06

Diagram 1

Diagram 2

Diagram 3

Diagram 4

Diagram 5

PAGE 3

Assembly For 

Everlast Powercore

TM

 Freestanding Heavy Bag

Model #P00001266

Summary of Contents for P00001266

Page 1: ...arden Dr Oakville ON L6J 7Z2 Customer Service 800 668 559 Warning This Product is sold for use in high risk activities Before using this product read all inclosed information Read entire manual before assembling or using this product Retain this manual for future reference Note Warning Label ...

Page 2: ...ARNING Failure to follow instructions herein may cause serious injury Boxing is an invigorating yet strenuous activity Before starting any workout routine consult your physician Before each use please inspect to make sure that the Everlast PowercoreTM Freestanding Heavy Bag is in good working order and that all bolts are tightened This product is subject to sliding or shifting based on the surface...

Page 3: ...1 No JS 9 Connecting Tube 1 No JS 10 Shell 1 Yes JS 11 Main Foam Section 1 Yes JS 12 Foam Centre Plug 1 No JS 13 White Foam Ring 1 No JS 14 Black Foam Ring 1 No JS 15 Allen Wrench 1 No P00001266 POWERCORE FREESTANDING HEAVY BAG EXPLODED DRAWING PARTS LIST 12 10 15 11 13 14 09 08 07 06 02 03 04 05 01 PAGE 2 Please separate and inventory all components to ensure you have everything needed for assemb...

Page 4: ...ck Foam Ring 1 STEP 1 BASE CONSTRUCTION Sub Step 1 Insert Foam Centre Plug 12 into the Main Foam Section 11 pushing all the way to the bottom Sub Step 2 Insert White Foam Ring 13 into Shell 10 this is best accomplished by putting the ring in at an angle then pulling the Shell 10 up around it Sub Step 3 Insert Black Foam Ring 14 into Shell 10 this is best accomplished by putting the ring in at an a...

Page 5: ...reTM Freestanding Heavy Bag STEP 4 CUSTOMIZING AND ACCESSORIES Items needed for step 3 No Description Qty 08 Adjusting Pole 1 Assembly For Everlast PowercoreTM Freestanding Heavy Bag Model P00001266 GO TO EVERLAST COM FOR HEAVYBAG WORKOUT TIPS AND FREE RING TIMER DOWNLOAD 08 07 Diagram 1 Diagram 2 PAGE 4 Sub Step 1 Screw Adjusting Pole 08 into Connecting Pole 07 as shown in Diagram 1 Sub Step 2 Sl...

Reviews: