STEP 3 (See Diagram 3)
A.) Attach the Right Vertical Beam (#3) onto the Right Base Frame (#1). Secure it with
two M10 x 2 ½” Carriage Bolts (#87), Ø ¾” Washers (#94), and M10 Aircraft Nuts
(#97).
B.) Attach the Left Vertical Beam (#17) onto the Left Base Frame (#14). Secure it with
two M10 x 2 ½” Carriage Bolts (#87), Ø ¾” Washers (#94), and M10 Aircraft Nuts
(#97).
C.) Place the Right Upper Frame (#4) onto the Right Vertical Beam (#3). Secure it with
two M10 x 2 ½” Carriage Bolts (#87), one 4 3/8” x 1 ¾” Bracket (#32), two Ø ¾”
Washers (#94), and two M10 Aircraft Nuts (#97).
D.) Place the Left Upper Frame (#18) onto the Left Vertical Beam (#17). Secure it with
two M10 x 2 ½” Carriage Bolts (#87), one 4 3/8” x 1 ¾” Bracket (#32), two Ø ¾”
Washers (#94), and two M10 Aircraft Nuts (#97).
E.) Attach the rear of Right Upper Frame (#4) to the Rear Vertical Beam (#9). Attach the
rear of Left Upper Frame (#18) to the Rear Vertical Beam from the other side. Align
the holes and secure them together with one M10 x 2 ½” Carriage Bolt (#87), Ø ¾”
Washer (#94), and M10 Aircraft Nut (#97) to the lower hole. Secure the upper hole
with one M10 x 2 3/8” Allen Bolt (#84) and Ø ¾” Washer (#94).
F.) Move the machine to its final location before move on to the next step.
9
Summary of Contents for EVE-1500
Page 5: ...HARDWARE PACK 4...
Page 6: ...HARDWARE PACK 5...
Page 7: ...HARDWARE PACK 6...
Page 11: ...DIAGRAM 3 10...
Page 13: ...DIAGRAM 4 12...
Page 17: ...Cable Loop Diagram 16...
Page 20: ...DIAGRAM 9 19...
Page 24: ...DIAGRAM 12 23...