EVERLAST CLIMBING KERSPLASH Installation Instructions Manual Download Page 6

1-800-476-7366  |  [email protected]  | WWW.EVERLASTCLIMBING.COM

© 2013 EVERLAST CLIMBING, A PLAYCORE COMPANY

K E R S P L A S H

®

  P O O L   C L I M B I N G   W A L L   I N S TA L L AT I O N   I N S T R U C T I O N S

6

ATTACHING THE CLIMBING PANELS TO THE FRAME

NOTE: If your environment is humid, we recommend applying an extra coat of Spectra Shield to 
the frame. To order, contact Spectrum Aquatics (Part Number 202050-00), at 800.791.8056.

Lay the stainless steel frame on its back with the spine towards the ground.  
Place the panels on top of the frame and drop in button head screws to 
hold the panels in place, but do not tighten.  For ease of installation and to 
accommodate manufacturing and temperature variances, each climbing 
panel has 6 mounting slots that allow for adjustment when attaching the 
panels to the frame. For the bottom panel, center the fasteners in each of 
these slots.  

Attach the climbing panel to the climbing frame as shown  
below using the following hardware:

 

6 - 3/8” x 1 ¼” Button Head Socket Screw

 

6 - 3/8” Flat Washers

 

6 - 3/8” Nylock Nuts

Affix the 2’ x 4’ safety panel to the top of the climbing frame using:

 

4 - 3/8” x 1 ¼” Button Head Socket Screws

 

4 - 3/8” Flat Washers

 

4 - 3/8” Nylock Nuts

Summary of Contents for KERSPLASH

Page 1: ...NSTALLATION INSTRUCTIONS TOLL FREE 1 800 476 7366 VOICE 651 665 9131 FAX 651 665 9130 INFO EVERLASTCLIMBING COM WWW EVERLASTCLIMBING COM 1335 MENDOTA HEIGHTS ROAD MENDOTA HEIGHTS MN 55120 2013 EVERLAS...

Page 2: ...components hardware and panels The following is a list of the components included with your shipment from Everlast Climbing Use Components and Hardware Figure A page 3 as a reference to identify each...

Page 3: ...ING COM WWW EVERLASTCLIMBING COM 2013 EVERLAST CLIMBING A PLAYCORE COMPANY KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS 3 Components Hardware Figure A 2 X 4 SAFETY PANEL 4 X 4 CLIMBING PANEL...

Page 4: ...with most state and local guidelines there must be at least 4 of clear deck space from the back of the frame on the deck to any obstruction Please verify your local and state codes prior to installat...

Page 5: ...scratch the panels during the installation process ATTACHING THE HAND HOLDS 1 Place the Hand Hold over the desired set of holes in the wall panel 2 Insert 2 button head bolt 3 8 lock washer and 3 8 w...

Page 6: ...e panels on top of the frame and drop in button head screws to hold the panels in place but do not tighten For ease of installation and to accommodate manufacturing and temperature variances each clim...

Page 7: ...ere the frames must be fastened together one about 2 down from the top and the next about 1 6 up from the pool deck Fasten the two frames together using fasteners SEE FIGURE F 2 3 8 x 4 1 2 Hex Screws...

Page 8: ...ng a hammer drill and a 5 8 carbide hammer drill bit drill the marked holes to a minimum depth of 4 STEP 5 It is very important to remove the debris and dust from the borehole Brush the borehole with...

Page 9: ...ivity of climbing can lead to significant personal injury disfigurement or death Even though one may be climbing indoors on an artificial wall risks still exist Artificial holds can spin and on rare o...

Page 10: ...warnings Only one climber is allowed on the Climbing Wall at a time Only feet first entries are allowed when entering into the water NO EXCEPTIONS No climbing on the back or sides of the structure Cl...

Page 11: ...egularly spraying down panels with non chlorinated cold water to remove chlorine water spotting is recommended Hand Holds Hand Holds should be mounted according to the installation instructions Observ...

Page 12: ...VOICE 651 665 9131 FAX 651 665 9130 INFO EVERLASTCLIMBING COM WWW EVERLASTCLIMBING COM 1335 MENDOTA HEIGHTS ROAD MENDOTA HEIGHTS MN 55120 2013 EVERLAST CLIMBING A PLAYCORE COMPANY KERSPLASH INSTALLATI...

Reviews: