EVC EVC63A 1P-Mod Quick Start Manual Download Page 1

EV Connection EVC63A 1P-Mod Protocol V1.0

 

EV Connection Sdn Bhd          Tel: +603-78872912        Fax: +603-78062677 

Address: Unit B716, Block B, Level 7, Kelana Square, Jalan SS7/26, 

Kelana Jaya, 47301, Petaling Jaya, Selangor, Malaysia 

Website: 

www.ev-connection.com

 

 

EVC63A 1P-Mod 

Single-Phase Two Module DIN rail Meters 

 

 

 

Measures kWh, Kvarh, KW, Kvar, KVA, PF, Hz, dmd, V, A, etc.   

 

Bi-directional measurement IMP & EXP 

Summary of Contents for EVC63A 1P-Mod

Page 1: ...3 78062677 Address Unit B716 Block B Level 7 Kelana Square Jalan SS7 26 Kelana Jaya 47301 Petaling Jaya Selangor Malaysia Website www ev connection com EVC63A 1P Mod Single Phase Two Module DIN rail Meters Measures kWh Kvarh KW Kvar KVA PF Hz dmd V A etc Bi directional measurement IMP EXP ...

Page 2: ... various important electrical parameters and provide a communication port for remote reading and monitoring Bi directional energy measurement makes the unit a good choice for solar PV energy metering PART 1 Specification General Specifications Voltage AC Un 230V Voltage Range 176 276V AC Base Current Ib 10A Max Current Imax 100A Mini Current Imin 0 5A Starting current 0 4 of Ib Power consumption 2...

Page 3: ... III Mechanical Environment M1 Electromagnetic environment E2 Degree of pollution 2 Output Pulse Output The meter provides two pulse outputs Both pulse outputs are passive type Pulse output 1 is configurable The pulse output can be set to generate pulses to represent total import export kWh or kVarh The pulse constant can be set to generate 1 pulse per 0 001 default 0 01 0 1 1kWh kVarh Pulse width...

Page 4: ...escriptions 1 7 digits used to display measured values or RTC 2 Total value 4 Import information Export information 5 Max Demand for Power or Current 6 Pulse output 1 and Pulse output 2 7 Measurement units 8 PF power factor Hz frequency 9 Bar display of Power 10 Communication indicator 11 Time information 12 Low battery warning 13 Lock symbol PART 2 Operation Initialization Display When it is powe...

Page 5: ...ront panel The display order by scroll button Total kWh import kWh export kWh total kVarh import kVarh export kVarh Max power demand voltage current W Var VA power factor Page Display Descriptions 1 Total active energy Example 70 00kWh 2 Import active energy Example 50 00kWh 3 Export active energy Example 20 00kWh 4 Total resettable energy 5 Total reactive energy Example 10 00kVarh The display ord...

Page 6: ...a Square Jalan SS7 26 Kelana Jaya 47301 Petaling Jaya Selangor Malaysia Website www ev connection com 6 Import reactive energy Example 5 00kVarh 7 Export reactive energy Example 5 00kVarh 8 Total resettable reactive energy 9 Total max demand Example 6930W 10 Voltage Example 229 8V 11 Current Example 30 156A 12 Active Power Example 4700W ...

Page 7: ...evel 7 Kelana Square Jalan SS7 26 Kelana Jaya 47301 Petaling Jaya Selangor Malaysia Website www ev connection com 13 Reactive Power Example 1030Var 14 Apparent power Example 4811VA 15 Power factor Example 1 000 16 Frequency Example 49 99Hz 17 Pulse Constant Example 1000 18 Modbus Address Example 001 19 Baud rate Example 9600 ...

Page 8: ...alaysia Website www ev connection com 20 Continuous running time In total Set up Mode To get into Set up Mode the user need press the Enter button for 3 second Page Display Descriptions The setting is done correctly The entering information is wrong The operation fails 1 Password To get into Set up mode it asks a password confirmation Default password 1000 2 Address ID Default ID is 001 Range 001 ...

Page 9: ...s 3 1 Press the Enter button the red digit flash Press the Scroll button to change the value After choose the new baud rate the user need pressing the Enter button to confirm the setting 4 Parity Default None Option None Even Odd 4 1 Press the Enter button the red part flash Press the Scroll button to change the option After choose the new Parity the user need pressing the Enter button to confirm ...

Page 10: ...n the user need pressing the Enter button to confirm the setting 7 Pulse duration Default 100mS Option 200 100 60ms 7 1 Press the Enter button the red part flash Press the Scroll button to change the option After choose the new Pulse duration option the user need pressing the Enter button to confirm the setting 8 Demand Integration Time Default 15 minutes Option 0 5 10 15 30 60 8 1 Press the Enter...

Page 11: ...ser need pressing the Enter button to confirm the setting 10 Backlit lasting time set up Default 60 min Option 0 OFF 5 10 20 30 60 Long press Enter button to enter set up mode 10 1 Press the Scroll button to change the option After choose the new Scrl option the user need pressing the Enter button to confirm the setting 11 Clear Long press Enter to enter clear interface 11 1 Clear Max demand of ac...

Page 12: ... Level 7 Kelana Square Jalan SS7 26 Kelana Jaya 47301 Petaling Jaya Selangor Malaysia Website www ev connection com 10 1 Press the Enter button the red part flash Press the Scroll button to change the value After choose the new password the user need pressing the Enter button to confirm the setting Wiring diagram Dimensions ...

Page 13: ...od Protocol V1 0 EV Connection Sdn Bhd Tel 603 78872912 Fax 603 78062677 Address Unit B716 Block B Level 7 Kelana Square Jalan SS7 26 Kelana Jaya 47301 Petaling Jaya Selangor Malaysia Website www ev connection com Installation ...

Reviews: