12

4.1 - CHECKS TO BE PERFORMED BY THE BARE EYE 

(Checks to be Performed While the Main 

Busbar is De-energized)

4.2 - MECHANICAL CHECKS (Checks to be Made in This Section Should Be Performed While 

the Main Busbar is De-energized.)

IMPORTANT WARNING: 

Never connect the MV cables connected to the output terminal in a way that will 

force the output terminals to pull down.

4 - COMMISSIONING

If a cubicle array will be formed by arranging various types of MMMH cubicles side by side and the commissioning 
wil be performed for the first time, it is recommended by our company to apply the following procedure:

1.  Check whether the connections of the cubicles’ main busbar are connected along with the disconnector or the 

load break switch or not and tighten the loose bolts and nuts if required. While checking the connectivity, be 
careful from damaging the bushings of the disconnector or the load break switch. Never step or walk on the 
busbar, disconnector or the load breaker switch

1.  Perform “Commissioning”, “De-commissioning” and  the “Accessibility to Cable Connection Compartment” for 

each cubicle in accordance with the operating instructions sticked on them. During that, check the mechanical 
interlocks are operating properly and no problems are occured.

2.  Please contact EVA ELEKTROMEKANİK  on (0090 312 811 2727) if any problem is encountered during the above 

points.

2.  Check if there is any unusual object inside the cubicle and take it out.

3. 

Check that there is at least 100 mm gap between the cubicles’ back and the building’s wall and that there is no 
objects in between.

4. 

Check whether the side cover plates used against the internal arc are fixed, if not fix them so. 

5.  If there is a battery rectifier group in the facility, ensure that is connected to a 220 / 230 VAC source. 

6. 

Ensure the grounding system of the cubicles by checking the grounding busbars of the cubicles’ array 
which must be properly and tightly connected to each other. Also, ensure the cubicles’ grounding system by 
checking the earthing busbar of the first or the last cubicle which must be connected to the external earthing 

system by an earthing conductor.

7.  Check the connections of the LV cabinet.

4.3 - SUPPLYING VOLTAGE TO THE MAIN BUSBAR AND REQUIRED CHECKS

4.4- OPERATING THE CABLE CONNECTION CUBICLE

4.5- SHUTTING DOWN THE CABLE CONNECTION CUBICLE

1.  By Switching off the switching elements of the incoming cubicle, energize the main busbar and wait for 90 to 

120 minutes.

2.  Ensure that the voltage indicators lamps of the incoming cubicle are off. 

3.  If no problems were observed then energize the cubicles one by one as stated below.
4. 

After energizing the cubicle’s array, check whether if there is unusual noise or not. 

1.  If the Cable Connection Compartment door of the Cable Connection Cubicle is Open, CLOSE it.

2.  Switch off the output feeder feeding the cubicle.

3.  Ensure  the voltage indicator lamps are on.

1.  Switch on the output feeder feeding the cubicle.

2.  Ensure  the voltage indicator lamps are off.

Summary of Contents for eva-36-CR

Page 1: ...www evaelektromekanik com CABLE CONNECTION CUBICLE 36kV METAL ENCLOSED MODULAR SWITCHGEARS MMMH USER GUIDE Assembly Operating and Maintenance Instructions...

Page 2: ...90 312 811 27 27 Fax 90 312 811 27 28 www evaelektromekanik com All rights reserved Any part of this catalogue can not be copied without the permission of the right holder It can only be copied and au...

Page 3: ...THE MAIN GROUNDING SYSTEM OF THE FACILITY 9 3 8 PASSAGES OF AUXILIARY SERVICE AND CONTROL CABLES FROM CUBICLE TO ANOTHER 10 3 9 CONNECTION OF MV CABLES 11 3 10 MATTERS TO BE CONSIDERED AGAINST INTERN...

Page 4: ...e related quality control processes to all the modulars the products will be ready for delivery and installation 1 1 GENERAL SECTIONS eva 36 CR SWITCHING SYSTEM IS FULLY COMPLIANT WITH TS EN IEC 62271...

Page 5: ...on Cable Connection and Main Busbar IAC A FL 16kA 1sec Protection Level TS 3033 EN 60529 IP3X Applied Standard TS EN IEC 62271 1 TS EN IEC 62271 200 Height mm 2250 Width mm 750 Depth mm 1400 1 3 KARAK...

Page 6: ...les can be carried either way as shown in the the pictures below In addition forklift is usually used to unload the cubicles from the truck and transport them to the assembly site 2 1 TRANSPORTATING W...

Page 7: ...ON 3 2 MATERIALS LIST SENT WITH THE CUBICLE Tools Dimensions Quantity Open End Wrench 10 2 Pcs Open End Wrench 13 2 Pcs Open End Wrench 15 1 Pcs Open End Wrench 17 1 Pcs Open End Wrench 19 1 Pcs Open...

Page 8: ...t inside the Building 3 3 CUBICLE S PLACEMENT Base holes that enable the cubicles to be fixed to the ground are provided as shown in the below picture Fix the cubicles to the ground by using M10 steel...

Page 9: ...el peg or an iron dowel should be used Then the holes to be fixed with M10x50 bolts MV Cable Entry Point Pull the lifting hooks upwards See below pictures Bring the cubicles to the settlement area by...

Page 10: ...ighten the bolts with 50Nm torque 3 Wipe the insulators and solid insulation materials with a dry clean cloth 4 Assemble the upper cover plate IMPORTANT WARNING If the surface on which the cubicles wi...

Page 11: ...s main grounding system use the grounding busbar located in the cable connection compartment of the cubicles See Picture 4 Any of the cubicles at the beginning or at the end of the cubicle s array ca...

Page 12: ...xt cubicle See the left picture 6 NOTE The connection between cubicle to another is made by combining the cable entry sockets that contain the electrical interlock and AC DC cables to each other NOTE...

Page 13: ...les from passing through them See picture 8 1 Open the cubicle s cable connection compartment door 2 Mount the cable terminal caps internal type on the MV cable terminals in accordance with the relate...

Page 14: ...is any unusual object inside the cubicle and take it out 3 Check that there is at least 100 mm gap between the cubicles back and the building s wall and that there is no objects in between 4 Check wh...

Page 15: ...AINTENANCE AND INSTALLATION Tools Dimensions Quantity Dirt Chemical Solution Clean Cloth Open End Wrench 10 13 15 17 19 24 2 Pcs Torque Wrench 1 Pcs Socket Wrench 1 Pcs Socket 10 13 15 17 19 24 1 Pcs...

Page 16: ...NOTES...

Page 17: ...Switching The Future...

Page 18: ...SAN VE T C LTD T DA YAKA MAH 2008 CAD NO 5 KAHRAMANKAZAN ANKARA T RK YE Tel 90 312 811 27 27 Fax 90 312 811 27 28 www evaelektromekanik com satis evaelektromekanik com METAL ENCLOSED MODULAR SWITCHGEA...

Reviews: