
BCU-NEV-XXC MANUAL
1.0
!
DO NOT ALLOW YOUR BATTERY TO DISCHARGE TO ZERO VOLTS.
IT WILL BE PERMANENTLY DAMAGED AND EV-POWER CAN TAKE NO
RESPONSIBILITY FOR THIS.
!
THE BATTERY SHOULD BE CHARGED REGULARLY IF BEING
STORED.
Cell Module Installation
The cell module signal current loop cable must be connected via daisy chain to the BMS cell
modules. The polarity does not matter.
This is covered in another manual. Install the cell modules first. It is not required for the
prefabricated EV Power Pak batteries.
The cell module daisy chain should be one single series string, not two or more
strings in parallel. Disconnecting one signal wire anywhere in the loop should immediately
activate the BCU alarm.
Charger Control
We use and recommend Elcon chargers for the BCU-NEV range. The BCU “charger control” output
may be used to enable/disable the charger. In this case the Elcon output terminals may be connected
directly to the battery positive and negative terminals.
PAGE OF
13
17