Page | 9
User Manual
▪
The material and dimensions of the skid must be suitable for the environment it is located in and can
withstand the weight of the modules as well as the vibration of the skids during operation.
▪
The feed, filtrate and concentrate ports of the modules are to be connected to their respective headers
via pipes or hoses and adaptors. Sufficient space must be catered for these fittings.
3.2 Module Installation
▪
Due to the size and weight of the ETUF module, it is recommended that at least 2 able-bodied personnel
handle each module at a time.
▪
After removing the ETUF module(s) from the packaging, do a visual inspection on the module(s) to make
sure that there are no damaged parts. Once satisfied, record all the serial numbers of the modules for
future references.
▪
There is preservative solution in every module. This needs to be drained (from the feed port) before
loading and operation. HOWEVER, if the membrane is not to be used immediately, do NOT drain the
preservative solution as it will cause the membrane to dry up, resulting in the closing of its pores.
Therefore, if the membrane is to be operated at a later date, one may either keep it in storage or install
the modules first without opening the ports and draining the preservative solution. For the latter, the
module may then be taken down and drained before operation begins.
▪
When loading the module onto the skid, make sure that module is vertical and that the filtrate end is
facing the top while the feed end is facing the bottom.
▪
Restrain the module onto the skid using a clamp or restraining cables.
▪
The main connecting points on the module are the feed port (for feed water, air and discharge), the
concentrate port (for concentrate recirculation and discharge) and the filtrate port (for filtrate and
backwash water).