![Euroscreen SI-H L 50 HC Installation And Maintenance Manual Download Page 23](http://html1.mh-extra.com/html/euroscreen/si-h-l-50-hc/si-h-l-50-hc_installation-and-maintenance-manual_2440084023.webp)
RELEASE ER 2020_02_21
This document is property of Euroscreen Srl.
Any distribution, reproduction, copying or publication of this document is prohibited.
Installation and maintanance manual
Projector lift Mod. SI-H L 50 HC
After having fixed the lift to the ceiling, please remove the panels from the lift
structure.
Without removing the panels from the lift structure (in order to keep tension onto
the steel cables), lift up the lift (using proper safety devices) aligning the brackets
with the drilled holes. Mount the lift to the ceiling using the suitable bolts/screws
and wall plugs (NOT SUPPLIED) suitable for the kind of ceiling and the weight
that have to be supported (max ø8).
Remove
adesive tape
Remove
adesive tape