00120091.DOCX, Version 1.1
14/16
4.3 Rear panel
(5)
Safety sockets 1-8
(6)
CEE sockets 1-4 (16 A each)
(7)
CEE input socket (63 A)
5. INSTALLATION
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
5.1 Connection with the mains
Connect the device to the mains with the CEKON plug. The earth has to be connected! If the device will be
directly connected with the local power supply network, a disconnection switch with a minimum opening of 3
mm at every pole has to be included in the permanent electrical installation.
DANGER TO LIFE!
Please consider the DIN 15560 and the respective national norms during the
installation! The installation must only be carried out by an authorized dealer!