TDA Thermodual Installation Manual
14
IN1233
Oct 2014 Edition 5
Installation Servicing Instructions
7.3 Unhinge
Doors
Before lifting the boiler off the pallet, we recommend unhinging both the filling and the ash
door. Please put them down carefully to avoid any damage.
Do not unscrew the hinges on the boiler side panels as the doors may become misaligned and
therefore the door tightness and correct functioning of the door contact switches cannot be
guaranteed.
There are two possible ways to lift the boiler off the pallet. At least two persons should always
lift the boiler off the pallet.
Remove the top lid (front and rear) and top insulation slabs from the boiler. Attach a suitable
lifting hook to the two crane eyelets located on either side of the boiler. The boiler can then be
lifted using suitable lifting equipment (forklift, lifting frame).
Remove the base plate and insulation slab from underneath the boiler. A forklift can then be
used underneath the boiler to lift it from the pallet.
CAUTION. The boiler weighs over 750kg. If the boiler is dropped during transport, people can be
seriously injured and the boiler can be damaged.
Make sure that you use appropriate lifting gear when installing the boiler.
7.4 Lifting the
Boiler