background image

 

 

 

14 

Assembly 

 

 

 

Quick installation guide_Conveyor system MB-flex S N_20221114_EN.docx 

 

 

 

9.  Insert fastening clip as follows: 

a)  Insert the yellow tab (1) with the foot pointing 

downwards into the lateral chain opening. 

b)  Subsequently press the blue closure PIN (2) 

from above into the opening over the tab until 
the PIN latches into place. 

Fig. 3: Assembling the modular chain belt 

 
 

Summary of Contents for MB-flex S

Page 1: ...Quick installation guide Conveyor system MB flex S stainless steel...

Page 2: ...oflexgmbh de Internet www euroflexgmbh de The document is protected by copyright All rights are strictly reserved Copying reproduction translation or conversion to an electronic medium or machine read...

Page 3: ...pecialist hydraulic personnel 7 2 5 Personal protective equipment 7 2 6 Protective enclosure Protective cover 7 2 7 Spare parts and their purchase 8 3 Assembly 9 3 1 Overview of MB flex S aluminium 9...

Page 4: ...artment will be happy to advise you on technical matters Information on ordering spare parts can be found in the section Spare parts and their purchase Page 8 Customer service Designation Specificatio...

Page 5: ...ith 2 2 Obligations of the owner The owner is obliged to implement measures that result from the specifications provided by the Machinery Directive 2006 42 EC The safety accident prevention and enviro...

Page 6: ...sks delegated to them and their potential dangers by the owner 2 4 2 Operating personnel Operating personnel are persons who have been instructed on the tasks delegated to them and their potential dan...

Page 7: ...eumatic equipment may only be carried out by specialist pneumatic personnel 2 4 7 Specialist hydraulic personnel Specialist hydraulic personnel are persons who as a result of their technical training...

Page 8: ...parts and accessories can be ordered directly from the manufacturer via the following contact Spare parts Contact Designation Specification Company euroflex GmbH Street no Hohe Flum Stra e 62 Postcod...

Page 9: ...nveyor system Overview of MB flex S stainless steel Page 9 Assembly the slide profiles on the holding profiles Page 10 Assembling the modular chain belt Page 13 3 1 Overview of MB flex S stainless ste...

Page 10: ...it off and guard it from being switched back on Prior to working in the system area empty or clear the system Regularly remove product residues and splitters from the entire system area Check that the...

Page 11: ...e slide profiles onto the top and bottom side 6 Mount the slide profile seams offset with a gap of approx 2 mm 7 Cut the slide profiles slant in the running direction 8 Lightly deburr the impact ends...

Page 12: ...ad carefully and flush 17 Rework possible supernatants with the file 18 In the case of chassis profiles cut off the screw head also from below chain running surfaces carefully and flush 19 Before inte...

Page 13: ...ms if necessary Observe the running direction of the chain 3 Feed the chain into the deflection in the running direction and slide on pull through until the chain has been completely pulled through th...

Page 14: ...Insert fastening clip as follows a Insert the yellow tab 1 with the foot pointing downwards into the lateral chain opening b Subsequently press the blue closure PIN 2 from above into the opening over...

Page 15: ...and Protective equipment Personnel and Protective equipment Specification Designation Personnel Operating personnel Personal protective equipment Protective equipment against the cleaning agents used...

Page 16: ...outside Perform the following steps 1 Remove residue of conveyance goods 2 Dry cleaning Remove coarse dirt without damaging the surface of the conveyor belt as well as gear wheels shafts and other par...

Page 17: ...ove accumulated water from the floor 7 Check and release for disinfection Check conveyor belt again by sensory analysis and disinfect Use an adenosine triphosphate ATP test to confirm exclude the pres...

Page 18: ...regional guidelines and commission a specialist company if required Malfunctions and excessive levels of wear on individual components are likely to result from the use of operating substances that c...

Page 19: ...protective devices for completeness and function 8 per shift Operating personnel Replace defective equipment Replace if required Maintenance personnel Check functionality of the operating and display...

Page 20: ...ear 500 Maintenance personnel Flange bearing Check eccentric ring for secure seating 170 Maintenance personnel Check motor plate for secure seating 500 Maintenance personnel Check bearing and links fo...

Page 21: ...work Store the maintenance logs 5 4 Repair Incorrect repair work impairs the operational safety This can cause accidents and seriously injure people as a result Observe the following Repair work may...

Page 22: ...eration Only carry out repairs maintenance cleaning and disassembly work when de energised If one or more chain links are damaged they must be replaced If an uneven running or ambient noise occurs it...

Page 23: ...lex S N_20221114_EN docx Perform the following steps 1 Loosen screws at the side parts of the deflection 2 Remove side parts 3 Lift the chain upwards Remove fastening clip as follows 4 Press the blue...

Page 24: ...nks 9 Reinsert the connecting rod Insert fastening clip as follows 10 Insert the yellow tab 1 with the foot pointing downwards into the lateral chain opening 11 Subsequently press the blue closure PIN...

Page 25: ...B flex S N_20221114_EN docx 6 Table of figures Fig 1 Overview of MB flex S aluminium example 9 Fig 2 Mounting of the slide profiles on the holding profiles 12 Fig 3 Assembling the modular chain belt 1...

Reviews: