6.3.2 Ball Siphons
If Ball Siphons with the design shown below are supplied by EUROCLIMA, then the following in-
structions should be followed during installation:
Depending on the suction side or pressure side mounting position, the siphon body has to be in-
stalled so that the direction of the arrow (see
) corresponds to the flow direction.
- Pa
=
suction side
+ Pa
=
pressure side
Figure 176:
Observe the mounting position - flow direction according to the arrow
Siphon on suction side (in direction of airflow before the fan)
Figure 177:
Suction side execution
Siphon on pressure side (in direction of airflow after the fan)
The black plug must be removed for the pressure side installation (see