background image

Installations

 (refer to Page 4 for parts)

:

As illustrated in Figure 1A, drill four holes with diam-

1.

eter not exceeding 5/8” and depth of 3” to 3-1/2” on the 
false ceiling. Fasten two hexagonal wood screws  at two 
of these holes opposite from each other, reserve approx-
imately 1/8” for the top support plate as shown in Fiture 
1B. Cut out a circle of 7-1/2” diameter for duct work. Use appropriate anchors for your ceiling composition:

Wood ceiling: Use the provided hexagonal wood screw.

• 

Sheet rock ceiling: Attach top supporting plate to ceiling joists or stud blockings if possible. If ceiling 

• 

joists or stud blockings are not available, it is required to build a supporting structure behind the sheet 
rock for best weight support.

Concrete ceiling: Use designated screws (not provided).

• 

Place support frames inside the top support plate, adjust 

2.

support frames to lengh required and lock the support 
frames using sixteen (16) 4mm x 8mm Phillips Head Tap-
ping Screw as shown in Figure 2.

Support 
Frames

Length required

Figure 2

Align the holes in top 

3.

support plate with two 
screws on the ceiling. 
Push upward (1) and 
slide forward (2) so 
the top supporting 
plate locks into place, 
see Figure 3. Fasten 
two existing hex-
agonal wood screws 
, insert two more on 
the last two holes 
and fasten them.. 

CAUTION: MAKE 
SURE the support 
frame fixture is secure 
before releasing!

Figure 3

Ceiling

(2) Slide 
Forward

(1) Push 
Upward

Front of the hood

Ceiling

Side of 
the hood

Ceiling

Top 

Support 

Plate

Figure 1A

Figure 1B

Hexagonal 
Wood Screws

Top Support 
Plate

Top Support 

Plate

Page 10

Installation

Summary of Contents for Spagna Vetro 168 Series

Page 1: ...e and Users Manual Island Mount Range Hood SPAGNA VETRO 168 Series NOTICE Installer Leave this guide with the homeowner Homeowner Keep this guide for future reference 236536 IMPORTANT Read and save th...

Page 2: ......

Page 3: ...horities Before servicing or cleaning unit switch power OFF at service panel and lock service panel to pre vent power from being switched ON accidentally Clean grease laden surfaces frequently To redu...

Page 4: ...range hood Clean ventilating fan frequently Always use appropriate cookware and utensils size Always use cookware appropriate for the size of the surface element To reduce the risk of injury to perso...

Page 5: ...ount heights clearance 5 6 Calculating vent system length 6 Venting methods ductless conversion 7 Charcoal lters electrical requirements 8 Preparation 9 Installation 10 12 USE AND CARE Range hood oper...

Page 6: ...Set Outer Support Frame 4 Pcs This Guide and Warranty Card 1 Set 4mm x 16mm Round Phillips Head Screw 18 Pcs 4mm x 16mm Phillips Head Tapping Screw 24 Pcs 4mm x 8mm Phillips Head Tapping Screw 16 Pcs...

Page 7: ...oun 2 tertop stove Distance between the countertop stove 3 to the range hood recommend 28 to 31 Height of hood and duct cover 4 For the most ef cient quiet operation A distance of 28 to 31 is recommen...

Page 8: ...ove top to hood bottom should be no higher than 31 inch It is important to install the hood at the proper mounting height Hoods mounted too low could result in heat damage and re hazard while hoods mo...

Page 9: ...Ductless conversion is intended for applications where an exhaust duct work is not possible to be installed When converted the hood functions as a purifying hood rather than an exhaust hood Fumes and...

Page 10: ...e plug only Always use plug provided If not possible connect three wires ac cording to its color black to Hot white to Neutral and green to Ground to house wires and cap with wire connectors Wire size...

Page 11: ...holes vent cutout if used and power supply cable cutout 4 on the ceiling Use drill and saber saw or keyhole saw to cut openings for power supply cable and vent see Venting requirements and Electrical...

Page 12: ...ind the sheet rock for best weight support Concrete ceiling Use designated screws not provided Place support frames inside the top support plate adjust 2 support frames to lengh required and lock the...

Page 13: ...e weight Install the Duct Set onto the body of the hood by using six 4mm x 16mm Phillips Head Tapping Screw 5 Install Aluminum Duct Tube on the Duct Set and make sure all joints are secured and air ti...

Page 14: ...ward Power Cord Figure 6A Figure 6B Aluminum Tube Hold upper chimney and lower chimney into position and remove the screw driver that is holding them up 7 Slowly slide down both chimneys until they si...

Page 15: ...the previous speed mode will cancel Press the Light Switch to power on the lights CAUTION DO NOT touch the lights until switched OFFand cooled Turn Off Press the Power Switch to turn off the power Pre...

Page 16: ...is not installed correctly or opening properly A tight mesh on a side wall cap unit might also cause restriction to the air ow The lights work but the blower is not spinning at all 4 is stuck or is ra...

Page 17: ...safety grills and lters in place Without these components operating blowers could catch on to hair ngers and loose clothing NEVER dispose cigarette ashes ignitable substances or any foreign objects in...

Page 18: ...regular basis but are required to be kept clean Filters should be cleaned after every 30 hours of use Remove and clean by hand or dishwasher Spray Formula 409 or equivalent degreasing detergent and le...

Page 19: ...ue to abuse misuse freight damage or improper installation Damage of product caused by accident re oods or act of God Euro Kitchen is not liable for and does not cover under warranty any loss of prope...

Page 20: ...for returns or exchang es Service visits not covered under warranty will carry a service charge Before Installation Return for exchange or refund please see above for acceptable returns After Installa...

Page 21: ...Your Notes Page 19...

Page 22: ...Your Notes Page 20...

Page 23: ...Your Notes Page 21...

Page 24: ...Euro Kitchen Inc 2341 Industrial Parkway West Hayward CA 94545 Ph 510 266 0099 Fax 510 266 6630 http www euro kitchen com...

Reviews: