![Eureka Jindara Installation Notes Download Page 2](http://html1.mh-extra.com/html/eureka/jindara/jindara_installation-notes_2436046002.webp)
Non-combustible
hearth
Breast plate no
thicker than 30mm
55 (appliance
to mantle upright)
250
2
p
e
t
S
1
p
e
t
S
Plaster, timber, MDF etc.
Minimum 9mm thick
cement sheet, villaboard
or non-combustible
material on front face
of framing
Non-combustible material can
overlap clearance gap between
ZCC and frameing, and run over
the front of the ZCC. DO NOT
silicon or adhear material to ZCC
as heat expansion of ZCC will
cause cracking.
Vent (optional) - Position vent
such that access is
available to fan power
supply when vent is
removed.
Hearth depth
mm in front
of unit
Vent may be
located in the
wall of on the floor.
Zero Clearance
Cabinet Installation
ZCC Part No. 232367
To suit Insert Models: Pearl & Tilga
1500
1410
Door
Removable fascia
Mantle only
hot air deflector
M8 cap screw
• 10” Upstands
55mm
97mm
• 8” Upstand
425mm
370mm
10”
8”
450mm
385mm
6 inch Flue Kit
Spigot
3rd Skin
2nd Skin
1st Skin
Heater
10” Gal Flue
8” Gal Flue
6˝ S/S Flue
4th Skin
Minimum Requirements:
Note: Some states will use different
size flue kits which will require the
appropriate upstande.
10” Upstand
8” Upstand
•
5 x 6” S/S Flue
•
4 x 8” Gal Flue
•
4 x 10” Gal Flue
Sheet 2 NEXT 2 GPN 232738 Rev.*