Eureka 215237 Installation Instructions Download Page 3

Step 2

1. Slide one fascia assembly (Part 1) over the front of the

heater, so that pre-drilled screw holes (A) and (B) are aligned.
(NOTE: These holes allow for a 680mm wall thickness.)

2. Insert screw (supplied) and tighten.

3. Do this on each side of the heater.

NOTE: If the wall thickness is between 680mm and 645mm, you
will need to drill a new 3mm dia. hole (A). Position it so that the
flue spigot will be centred within the wall cavity. e.g if the wall
thickness is 650mm, the hole should be drilled 217mm from the
centre of the spigot 

(B)

(A)

1/2 wall thickness 
(minus 108mm)

Step 1

1. Remove screws from the heater pedestal fascia panels

2. Position lower fascia panels (Parts 2 & 3) as shown (one on

each side and end of heater)

3. Reattach screws for both pedestal fascia panels.

Pedestal fascia panel
goes  on top of the
lower fascia panels

Lower

fascia panel

Lower

fascia panel

Panels should be flush
with side of base

1. Fascia Assembly - qty 2
2. Panel fascia - lower left hand - qty 2
3. Panel fascia - lower right hand - qty 2
4. Spray can
5. 8G self tapping screws - qty 22
6. Fascia retaining strips - qty 2
7. 3mm dia. drill
8. 5mm dia. drill

Parts

1

1

2

3

4

5

6

Sheet 2 of 4   GPN 215238

F:\Docs\Manuals\Heaters\HM215238\Duet In Wall Inst       

(through Windows NT Explorer)

Centre of spigot

Heater to be assembled from steps 1 to 4 before placing into masonry fireplace.

Reviews: