Operating Instructions
Euchner Control Box ECB-...
16
(Translation of the original operating instructions) 2533580-02-03/20
8.7. Cable outlets when using angled plugs
Euchner Control Box
X2: connection for CTP-LBI-AP (only ECB-A1)
X1: connection to PLC
X2: connection for CTP-LBI-AP (only ECB-A1)
X1: connection to PLC
The following applies to the device installation orientation shown:
Cable outlet C
(left)
Cable outlet A
(right)
C
A
Figure 8:
Cable outlets and installation orientation