OZ 3.1 Installation Guide

3.  Prepare the Ozone Modules

3.1  Set the device addresses

Each Ozone Module must be set to a unique device address.

Start by removing the bottom cover by unscrewing the four (4) 

M5x12 bolts from the side panel with T4 screwdriver and keep 

them in a secure place for later use.

To assign unique addresses to Ozone Module a narrow 2mm 

flat screwdriver will be needed. All Ozone Modules connected 

to a single Control Panel must have a unique device address. 

Addresses need to be set in ascending order begin with Ozone 

Module closest to the Control Panel and increasing by one for 

each sequential module. The first connected Ozone Module 

should have the address 1.

Example:

Ozone Module one (Adress 1): 
Switch 1x = 1
Switch 10x = 0

Ozone Module thirteen (Adress 13): 
Switch 1x = 3
Switch 10x = 1

Mark the installation positions of each Ozone Module

The location of each Ozone Module shall be marked by placing 

an identification label on the upper front panel of the canopy. The 

label should match the device address of the module installed 

beneath it. You will find a sheet of labels in the Control Panel 

package. 

NOTE!

 Installation may only be carried out byby specialist and authorized persons in accordance with 

local, regional, national standards and regulations.

00

55

1 1

2 2

33

44

66

77

8 8

9 9

1x

10x

0

5

1

2

3

4

6

7

8

9

0

5

1

2

3

4

6

7

8

9

Attn! 

Do not attach the sticker to 

the perforated area of the canopy

.

Summary of Contents for NORDcanopy OZ 3.1

Page 1: ...NORDcanopy OZ 3 1 Ozone Cleaning System Installation Guide...

Page 2: ...the device addresses 5 4 Installation 6 4 1 General information 6 4 2 Connect the pressure measurement hoses 7 4 3 Mount the Control Panel 8 5 Electrical Installation 9 5 1 Connect the main electrical...

Page 3: ...one O3 Ozone significantly reduces odor grease mold and bacteria ETS NORD AS disclaims any liability in the case that the product is not used in accordance with the manufacturer s instructions contain...

Page 4: ...ch kitchen The number of Ozone Modules is dependent on the design of the kitchen and the canopy as well as the equipment used for cooking This is decided when planning the kitchen 2 System overview Th...

Page 5: ...ontrol Panel and increasing by one for each sequential module The first connected Ozone Module should have the address 1 Example Ozone Module one Adress 1 Switch 1x 1 Switch 10x 0 Ozone Module thirtee...

Page 6: ...facturer s drawings The ozone duct must be made of acid resistant stainless steel AISI 316 Before starting the Ozone Module check visually that all ozone duct connections are airtight Always leave a m...

Page 7: ...module Feed the long hose through the 100mm ozone duct into the exhaust chamber While lifting the module into place securely attach one end of the hose to the hose located in the Ozone Module 100mm fl...

Page 8: ...it near any sources of moisture or heat The housing must be disassembled into three parts Remove the two fixing screws on the sides of the case Before mounting the backplate apply an even strip of wa...

Page 9: ...lied to the ozone system See the sample diagram below as one possible option to accomplish this function A maximum of 4 Ozone Modules and one alarm panel may be connected a single 10A C type slow circ...

Page 10: ...r the rear wall or the cable bushings in the bottom of the case Connect the 230V supply cable to the power supply terminals L N and PE as shown in the diagram Each Ozone Module has its own power cable...

Page 11: ...format That is similar terminals between devices are connected together there are no specific in or out data terminals on the various components Maximum limit for the number of Ozone Module connected...

Page 12: ...of any Ozone Module in the chain should share the same terminal screw in its respective connector In this way the three extra unused terminals just below on the connector block can be reserved for fu...

Page 13: ...ard as seen below LAN cable must be connected to a network switch or to the closest LAN socket Reassemble the housing in reverse order with the smaller LED display above the larger one Ensure the text...

Page 14: ...ction chamber of the canopy and that the bottom edges of all filters do not have any gaps Call service is lit is red This indicates a technical fault has been detected in the system Contact your ETS N...

Page 15: ...the initial commissioning of the device has been performed by an authorized partner of ETS NORD AS the equipment is serviced every 12 months after commissioning specified components eg ozone generatin...

Page 16: ...etsnord ee ETS NORD Finland Address Pakkasraitti 4 04360 Tuusula Finland Phone 358 401 842 842 info etsnord fi www etsnord fi ETS NORD Sweden Address J rsj gatan 7 69235 Kumla Sweden Phone 46 19 554...

Reviews: