ETP Transmission HYDRO-GRIP GE2 Operating Instruction Download Page 3

The GE2 allow you to choose from multiple tool attachments:

The GE2 arbor and all other parts must be thoroughly 
cleaned; removing all traces of grease, other impurities, 
dust chips etc. prior to any assembly work is carried out. 
Coat the GE2 arbor lightly with anti-moisture spray. Do 
not clean the GE2 parts in ultrasonic cleaning.

Tool attachment by using carrier pegs and the safety 
ring.

Slide the tool part (and spacers) onto the GE2 arbor. 
Make sure that the tool is positioned in such a way that 
the carrier pegs match the holes in the arbor flange.
Make sure that the total length of the tool (and spa-
cers) does not exceed the L1 length of the GE2 arbor 
and allow a clearance of 0,2-0,5 mm.  

Attach the safety ring and tight the fastening screw by 
using an Allen T-wrench (size 8 mm) to 8 Nm.

Pressurize the GE2 by tighten the pressurizing screw 
until it stops, max 4-5Nm by using an Allen T-wrench 
(size 6 mm). Any higher tightening torque will not 
increase the fastening force.

Tool attached to the flange using two or three screws 
(ideally for three wing tools).
Slide the tool part (and spacers) onto the GE2 arbor 
and insert the attachment.
screws. Tight the attachment screws finger tight.

Pressurize the GE2 by tighten the pressurizing screw 
until it stops, max 4-5Nm by using an Allen T-wrench 
(size 6 mm). Any higher tightening torque will not 
increase the fastening force.

Tighten the attachment screws to 8 Nm.

Assembly instructions

Tool attachment A

Tool attachment B

Reviews: