background image

South Bend, Indiana USA 

 |

  networketi.com

GPT-230 INSTALLATION GUIDE  |  PART NO. 

25300

 REV 

C

2

FIGURE 1. The GPT 230 wiring layout.

FIGURE 2. Mounting dimensions.

JP1

JP2

FPT130

Thermistor

Fault

FPT130

Set

Point

GPT

Heat On

Fir

e P

rot

Lock

Heat Off

1
0

1
1

0

0

1
0

0

1

50F
45F

30F

38F

JP1

JP2

FPT130

Thermistor

Fault

FPT130

Set

Point

GPT

Heat On

Fir

e P

rot

Lock

Heat Off

1
0

1
1

0

0

1
0

0

1

50F
45F

30F

38F

JP1

JP2

FPT130

Thermistor

Fault

FPT130

Set

Point

GPT

Heat On

Fir

e P

rot

Lock

Heat Off

1
0

1
1

0

0

1
0

0

1

50F
45F

30F

38F

INPUT POWER

Line / Black - Line 1

Neutral / White - Line 2

Ground / Green

HEATER CABLE

Line / Black - Line 1

Neutral / White - Line 2

Ground / Green

Perform the following steps with the circuit breaker to the unit OFF. The TRACON GPT 230- is permanently 

connected equipment and does not have an internal disconnect device. When power is applied, the system 

will start.

NOTE:

1. INSTALL THE CONTROL BOX

Use the box itself as a template to determine the mounting 

hole footprint. Install the box to a solid, stable surface 

capable of supporting four times the weight of the box, 

or about 20 pounds. Use all four mounting holes. Install 

the control box to the wall using heavy-duty 1/4” or 6.3 

mm fasteners long enough to fasten the box securely. Do 

not fully tighten mounting hardware at this time. Leave the 

mounting hardware loose enough to work the conduit into 

place. Hardware will be fully tightened following installation 

of the conduit.

GPT 230

HEAT TRACE CONTROL

Copyright © 2019 ETI, ® All rights reserved. 

Reviews: