ETI Snow Switch PD PRO Quick Reference Installation Manual Download Page 2

South Bend, Indiana USA 

 |

  networketi.com

SNOW/ICE CONTROL INSTALLATION GUIDE  |  PART NO. 

24455

 REV 

D

2

Cable Function

 

Wire Lead

 

Connect To:

INPUT POWER (provided by customer)

Line 1  

Line 2 / Neutral Ground

Black 

White

Green

OUTPUT TO HEATER  

(provided by customer)

Heater Load Line

Heater Load Neutral 

Heater ground (Shield)

Yellow

Yellow

Green

Reviews: