![ETH-messtechnik DRVL Operator'S Manual Download Page 11](http://html1.mh-extra.com/html/eth-messtechnik/drvl/drvl_operators-manual_2432543011.webp)
messtechnik gmbh
11
6. The measurement-chain setup
A measurement chain is required for the transducer to take measurements.
The measurement chain consists of:
• a torque transducer
• a connection cable
• a power supply and display unit
A power supply is required to supply the transducer with the necessary opera-
ting voltage. The transducer is fitted with a measurement amplifier (hence, no
other amplifier is needed). The measurement data can be transmitted to a lap-
top, for example, or displayed and analyzed with power supply and display units.
Summary of Contents for DRVL
Page 21: ...messtechnik gmbh 21 ...
Page 22: ...messtechnik gmbh 22 ...
Page 23: ...messtechnik gmbh 23 ...