ETCR ETCR 7000 Manual Download Page 4

 

-1- 

Warning 

 

Thank you for purchasing our ETCR7000 Large Caliber Leakage Clamp Meter, 

in order to better use of this product, be sure to: 

        ----To read this user manual carefully.   

----Comply strictly with safety rules and precautions set out in this manual. 

 

u

   Pay special attention to safety under any circumstances while using the         

instrument. 

u

   Take note of the label text and symbols on the panel and back of the     

instrument. 

u

   Keep the clamp clean and maintain regularly. 

u

   Please  don

t  place  and  store  the  instrument  at  the  place  with  high 

temperature,  humidity,  moisture  condensation  and  straight  sunlight  for  a 

long time. 

u

   Replace battery in time when the battery voltage is low. 

u

   Remove or replace the battery if you expect not to use the instrument for a 

long time. 

u

   Take note of the polarity when replace the battery. 

u

   The operation, demolition, calibration and maintenance of the instrument   

must be carried out by qualified personnel authorized to do so. 

u

   The meter should be stopped from being used immediately and sealed if   

danger is brought up in case of continued use; only a competent body can 

be authorized to deal with it. 

u

  

       

 in the manual is the safety warning sign, the contents of this manual     

must be followed for safe operation. 

u

  

       

 and other safety signs, the contents of this manual must be followed   

for safe operation. 

 

Summary of Contents for ETCR 7000

Page 1: ......

Page 2: ......

Page 3: ... 3 Ⅳ Technical Specification 3 Ⅴ Instrument Structure 5 Ⅵ Method of Operation 5 1 Switch On Off 5 2 Backlight Control 6 3 Data Hold Storage 6 4 Data Access Exit 6 6 Delete Data 6 7 Leakage Current Current Voltage Measurement 7 Ⅶ Battery Replacement 9 Ⅷ Accessories 9 ...

Page 4: ...condensation and straight sunlight for a long time u Replace battery in time when the battery voltage is low u Remove or replace the battery if you expect not to use the instrument for a long time u Take note of the polarity when replace the battery u The operation demolition calibration and maintenance of the instrument must be carried out by qualified personnel authorized to do so u The meter sh...

Page 5: ...r is widely used in electric power communication meteorology railway oil field architecture measuring teaching research unit industrial mining enterprises etc ETCR7000 series of Large Caliber Leakage Clamp Meter s clamp core is made of special alloy adopt the latest magnetic shielding techniques can almost shield the influence from external magnetic field to ensure the high precision high stabilit...

Page 6: ...operator must strictly abide by safety rules otherwise there is risk of electric shock resulting in bodily injury or fatalities Warning Safety rules must be strictly abided by otherwise personal injury or equipment damage may be caused Alternate Current AC Direct Current DC Double Insulation Ⅳ Technical Specification Function Measure AC leakage current current there phase voltage Power 6V DC LR6 4...

Page 7: ...play Mode LCD 128dots 64dots Display area 43mm 29mm Meter Size Length 275mm Width 145mm Height 40mm Backlight Controlled by LIGHT key Data Hold HOLD symbol appears Overflow OL symbol appears Automatic Shutdown Automatically shutdown about 15 minutes after power on to reduce battery consumption Voltage Detection Low battery symbol appears to remind the replacement of battery when the battery voltag...

Page 8: ...screw 1 piece Ⅵ Method of Operation 1 Switch On Off Press POWER key to switch on LCD display in test mode press POWER key to switch off The meter will automatically power off after booting 15 minutes later If LCD display is darker maybe the battery voltage is too low please replace batteries In data hold mode firstly press HOLD key to cancel the lock then press POWER key to switch off ...

Page 9: ... MENU key to access data inquiry form group R 001 and display READ symbol It is allowed to rapidly navigate to the desired page number Press key to increase the page number by one press key to increase the page number by ten Press MENU key to exit date inquiry back to test mode 5 Data Upload Connecting the meter and computer with USB RS232 communication line attached in package Start up the meter ...

Page 10: ...sure the measured wire at approximately the geometric center of the clamp Clean the clamp after finishing measurement regularly maintain the meter Be sure to connect test wires correctly when measuring voltage to avoid short circuit After measuring voltage should firstly take the test line away from measured wire and then draw from meter in order to avoid shock Clamp live wire and null line togeth...

Page 11: ... 8 Test reference illustrations Measu ring Box Test phase current and voltage Test power safety Test leakage of bury cable in wall Test equipment safety operation Test ground leakage Ground ...

Page 12: ...r voltage is lower than 5 2V indicating that the battery should be replaced 2 Press POWER key make sure the meter is power off Loosen the battery cover screw open the plate replace new batteries and cover the plate then tighten screw 3 Press POWER key to check whether the batteries are successfully replaced repeat step 2 if it doesn t work Ⅷ Accessories Main Unit 1 piece Meter Box 1 piece Test Lin...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ... Electronic Technology Company Address F 3F No 4 Pengshang Zhifu Road Jiahe Baiyun District Guangzhou Guangdong China Post Code 510440 Tel 86 20 62199556 62199553 Fax 86 20 62199550 E mail info etcr cc Website www etcr cc ...

Reviews: