ETCR 6300D User Manual Download Page 4

 

-2- 

u

   When changing batteries, please pay attention to the polarity of battery.   

u

   Use,  disassembly  and  maintenance  of  this  leaker  shall  be  operated  by 
authorized personnel.   

u

   In case dangers would occur if continue to use a faulty leaker, please stop 
to  use  it  and  seal  it  for  safekeeping  immediately;  and  then,  send  it  for 
disposal of authorized agency.   

u

   Users shall carry  out  operation  based on  danger  signs 

       

  on leaker 

and manual.   

u

   Users shall carry out safety operation based on instructions listed in this 
manual, e.g. 

       

 and danger signs on this manual.   

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for 6300D

Page 1: ......

Page 2: ...Electrical Signs 4 IV Technical Specifications 5 V Structure of the Leaker 7 VI LCD Display 8 VII Operating Method 8 1 Start up Shutdown 8 2 Leaker Measurement 9 3 Peak Holding 11 4 Hold Storage and Access Reading 11 VIII How to Change Battery 12 IX Accessories 13 ...

Page 3: ...l texts and symbols on panel and back plate of this leaker u Do not input current more than 7A the tester measurement cannot exceed 7A and no OL symbol indicates u After power on please calibrate zero before measuring u Please don t place and store this leaker in hot and humid condition locations with moisture condensation and under direct sunlight for a long time u In case voltage of battery was ...

Page 4: ...n case dangers would occur if continue to use a faulty leaker please stop to use it and seal it for safekeeping immediately and then send it for disposal of authorized agency u Users shall carry out operation based on danger signs on leaker and manual u Users shall carry out safety operation based on instructions listed in this manual e g and danger signs on this manual ...

Page 5: ...meteorology railroad oilfield construction measurement scientific research teaching institutes industrial and mining establishments the car circuit maintenance Clamp core of this DC Clamp Leaker adopts high magnetic alloy in addition with utilization of multilayer shielding technology it is almost free from influences of external magnetic field so as to ensure high precision high stability and hig...

Page 6: ... Measure Range Accuracy Resolution DC current 0 0mA 6 00A 2 rdg 5dgt 0 1mA Condition 23 5 below 75 rh wire in the center of the jaw III Electrical Signs Extremely dangerous Operators shall strictly keep to safety rules otherwise there would be dangers of electric shock to cause personal injuries or casualties Dangerous Operators shall strictly keep to safety rules otherwise there would be dangers ...

Page 7: ...r Zn Mn dry battery 6F22 9V DC continuous use for 60 hours Test Mode Clip on CT Magnetic modulation Clamp Size 25mm 30mm Range 0 0mA 6 00A DC Resolution 0 1mA DC Accuracy 23 3 below 70 RH 0 0mA 300 0mA DC 2 rdg 5dgt 0 30A 6 00A DC 2 rdg 5dgt Shield Type Double shielding Display Mode Four digits LCD display Dimension LWH 175mm 70mm 38mm ...

Page 8: ...B upload to PC or on line monitoring Data Memory 99units FULL blinks when the memory is full Peak Hold Push HOLD without release the meter will show the peak value during the pushing period Reading Hold DH indicating the reading is hold Out of Range OL indicating the current is out of range Auto Power off 5 Minutes after power on it will power off automatically to lower the power consumption Batte...

Page 9: ...gth AC3700V rms between the alloy of the clamp and the housing Applicable Safety Rules IEC1010 1 IEC1010 2 032 Pollution degree 2 CAT Ⅲ 600V V Structure of the Leaker 1 Clamp 25mm 30mm 2 DC current positive input indication 3 Upper Cover 4 Totoid Opening Lever 5 POWER key 6 HOLD Key 7 ZERO Key 8 LCD 9 USB Interface 10 Back cove 11 Battery cover ...

Page 10: ...lay Press the POWER key again the leaker will shut down After starting up for 5 minutes LCD will flick notes that the leaker will shut down automatically after flickering for 30s it will shut down formally to reduce battery consumption In case you have pressed POWER key when LCD was flickering the leaker will continue to work for 5 minutes If LCD was very dark after starting up it might be caused ...

Page 11: ...o cause personal injuries or equipment damages 1 Power on 2 Close to the measured conductor press the ZERO key to clear 3 Press down trigger to open clamp head and clamp to be measured conductors Be attention that clamp heads must be totally closed Clamp live wire and null line together is to measure leakage current of electrical equipment Note 2 lines Clamp earth wire is to measure grounding line...

Page 12: ...urrent line to test 4 Read LCD display data In case OL mA symbol was displayed it means that current of measured line is beyond the maximum limit of this leaker with this case please shift gear with much higher range limit In locations with difficulty to read out data please use the data holding function If DH symbol displayed please discharge data holding state ...

Page 13: ...od of time release the key it then will return to measuring state 4 Hold Storage and Access Reading 1 Pressing HOLD key for a short time in the course of measurement less than 3 seconds DH symbol will display the leaker will hold current measuring data and automatically stored in the memory with a unit ID press HOLD key again to release the hold state and the leaker continues its measuring in case...

Page 14: ...er displaying dEL symbol it means that it has finished cleanup process and then return to measuring state automatically VIII How to Change Battery Warning It is dangerous to carry out test when the battery cover plate was not on its position Please pay attention to the polarity of battery to avoid damaging the leaker Chang the low battery in time If you expect not to use the meter for a long time ...

Page 15: ... battery special attention shall be paid to the polarity of battery at last cover battery cover plate IX Accessories Clamp tester 1 pc USB Com cable 1 pc Software 1 disk User Manual 1 copy Warranty card Certification 1 copy ...

Page 16: ... Electronic Technology Company Address F 3F No 4 Pengshang Zhifu Road Jiahe Baiyun District Guangzhou Guangdong China Post Code 510440 Tel 86 20 62199556 62199554 Fax 86 20 61100822 E mail info etcr cc Website www etcr cc ...

Reviews: