26
ERn Wall-mount Installation Manual
Install the BatteryPack Option (UBPO) Kit
1:
The BatteryPack Option board is provided with a wiring harness for connection between the
BatteryPack and the right I/O board. Install the Unison BatteryPack Option cable harness and
connector into the ERn enclosure.
Note:
An ERn enclosure supports the use of either the Unison RideThru Option (URTO) or
the Unison BatteryPack Option (UBPO), but not both in the same enclosure.
Note:
The BatteryPack Option kit is intended for use only in wall mount ERn enclosures and
is not compatible with rack mounted enclosures.
The BatteryPack Option (UBPO) kit provides battery power
during power outages to the Paradigm Architectural Control
Processor for up to 90 minutes (ERn with a single P-ACP) or
up to 45 minutes (ERn4 with two Paradigm ACPs). The
self-contained battery installs on the bottom of the ERn
enclosure.
ERn after UBPO cable and connector
installation
a: Insert the connector end through the opening in the bottom of the
ERn enclosure. The connector is designed to snap into place without
additional hardware, slight force may be required to ensure the
connector installs properly.
b: Connect the two pin connector to the appropriate receptacle labeled
“Ride Thru / Batt” on the ERn right I/O board. See