BluesSystem Installation Manual
Step 4:
Connect control.
a: Locate the pre-stripped violet wire inside of the termination kit.
b: Loosen but do not remove the CTRL terminal screw on the back of the fixture.
c: Insert the spade terminal under the screw and tighten the screw firmly to secure.
d: Locate a 3 position WAGO inside the termination kit and open all terminal levers.
e: Insert the pre-stripped end of the pigtail into a terminal and close the lever.
f: Strip the control wire from the power supply .35-.39” (9-10mm), then insert it into
a terminal and close the lever.
g: If continuing to another fixture in the run, strip the wire .35-.39” (9-10mm) and
insert it into the third terminal and close the lever.
Step 5:
Push all terminated wiring through to the junction box.
Step 6:
Install the BlueBeam/BlueDome LED fixture to the installed junction box using the
provided hardware.
Maximum Cable Length Charts
One-Zone LV Power Supply at 24 VDC
Six-Zone LV Power Supply at 36 VDC
AWG
Max run in ft
Max run with double ground
12
396
792
2.5mm
2
307
614
14
249
498
16
157
313
18
99
197
AWG
Max run in ft
Max run with double ground
12
594
1188
2.5mm
2
460
920
14
374
747
16
235
470
18
148
296
pre-
stri
pp
ed C
TRL
wi
re
from
power
sup
ply
to
the next
fixtu
re