background image

ETAS

Cables and Accessories

XETK-S31.0

 

-

 

User

 

Guide

43

8.1.3

CBAM271 Adapter Cable

Fig.

 

8

-

3

CBAM271 Adapter Cable

XETK ECU Adapter Cable, 100

 

Mbit/s, pre-assembled into PG9 screwing, shield 

on ECU- housing, Lemo 1B PHE - JST PHR (10fc-5fc), 0.5

 

m length. Fits for 

ETKS_C3 case.

NOTE

For mounting the cable, cut a PG9 thread into the ECU housing. For thin 
walled housings use a nut SM-PE 9. Available from Lapp, Order number: 
52103210.

Product

Length

Order Number

CBAM271.1-0m5

0.5

 

m

F 00K 107 867

Summary of Contents for XETK-S31.0

Page 1: ...ETAS XETK S31 0 Emulator Probe for MPC57xx and EMU57xx MCU Family User Guide...

Page 2: ...ngle license Using and copying is only allowed in concurrence with the specifications stipu lated in the contract Under no circumstances may any part of this document be copied reproduced transmitted...

Page 3: ...formity 12 2 7 UKCA Conformity 12 2 8 RoHS Conformity 13 2 9 Declarable Substances 13 2 10 Use of Open Source Software 13 3 Introduction 14 3 1 Applications 14 3 2 Features 15 4 Hardware Description 1...

Page 4: ...acteristics 36 7 8 1 JTAG Timing Diagram 36 7 8 2 JTAG Timing Parameters 36 7 9 Electrical Characteristics 37 7 9 1 ECU Interface Characteristics 37 7 9 2 ECU Interface Connector CON2 38 7 10 Pin Assi...

Page 5: ...Adapter ETAM3 48 8 6 3 XETK ECU Adapter ETAM5 49 9 Ordering Information 50 9 1 XETK S31 0 50 9 2 XETK ECU Adapter 50 9 3 Power Supply 50 9 4 Cables 50 9 4 1 ECU Adapter Cables 51 9 4 2 Combined ECU A...

Page 6: ...ry steps for his are in a step by step guide Target definition 1 Step 1 2 Step 2 3 Step 3 Result DANGER indicates a hazardous situation with a high risk of death or serious injury if not avoided WARNI...

Page 7: ...Guide 7 1 3 Typographical Conventions Hardware 1 4 Presentation of Supporting Information Bold Menu commands buttons labels of the product Italic Emphasis on content and newly introduced terms NOTE Co...

Page 8: ...rs and Duties for Operators The product may be assembled operated and maintained only if you have the necessary qualification and experience for this product Incorrect operation or operation by users...

Page 9: ...ccessible The module does not have an operating voltage switch Switch on the product by connecting the power supply cable with the power supply or by switching on the power supply Switch off the produ...

Page 10: ...ve cleaners which could damage the product Transport and Installation CAUTION The ETK can be damaged or destroyed Some components of the ETK board may be damaged or destroyed by elec trostatic dischar...

Page 11: ...s of the product Symbol Description The User Guide must be read prior to the startup of the product Symbol for WEEE see chapter 2 5 on page 12 Marking for CE conformity see chapter 2 6 on page 12 Mark...

Page 12: ...eturn them to the WEEE take back system for recycling The WEEE directive concerns all ETAS devices but not external cables or batteries For more information on the ETAS GmbH Recycling software contact...

Page 13: ...na RoHS Management Methods for Controlling Pollution Caused by Electronic Information Products Regulation applicable in China with the China RoHS marking affixed to the product or its packaging 2 9 De...

Page 14: ...pports the standard full duplex 100Base T Ethernet inter face and can be connected directly or via ES51x ES59x ES600 modules to the PC No additional ETAS modules are required for the access to the ECU...

Page 15: ...Startup Handshake duration of the Wake up mechanism is configurable ECU flashing via XETK Braindead flashing under ProF control Permanent storage of configuration in EEPROM Fast Ethernet Interface Di...

Page 16: ...d development system through the XETK Ethernet interface This pro cess enables adjustments of parameters characteristic lines and maps through the calibration and development system Using an additiona...

Page 17: ...icrocontroller type In general the ECU interface con sists of 1 ECU voltage line which is not used for XETK power supply but only for detection of the ECU status therefore the power consumption on thi...

Page 18: ...nd Calibration standard XCP on Ethernet TCP IP UDP IP The open XCP on Ethernet interface allows for connecting to the XETK S31 0 with third party application software Fig 4 3 Location of the XETK Ethe...

Page 19: ...4 5 ECU Voltage Supervisor The ECU voltage VDDP is monitored by the XETK to recognize whether the ECU is switched on or off Additionally the ECU RAM standby voltage VDDS BRAM is monitored to determine...

Page 20: ...ash to the emula tion space To enable calibration the Working Page must be activated The process of switching from the Reference Page to the Working Page and vice versa is known as page switching The...

Page 21: ...four internal timers of the XETK for triggering See also chapter Timer Triggering on page 22 4 9 Pinless Triggering 4 9 1 Startup Handshake The JTAG Data Communication JDC register is used to generat...

Page 22: ...e period is used for triggering The time intervals between trigger events are in accordance with the config ured timer values This values and their resolution have to be defined in the XETK s configur...

Page 23: ...is allows it to detect when the ECU is off and forward this information to INCA In addition it allows the XETK to enter the power save mode with the calibration system unplugged 4 12 Pull CalWakeUp un...

Page 24: ...en populated onto the ECU PCB for adapters ETAM3 and ETAM2 ETAM5 see Fig 5 2 for additional connector details Fig 5 1 XETK S31 0 Connection to the ECU CAUTION Some components of the interface board ma...

Page 25: ...ETAS Installation XETK S31 0 User Guide 25 Fig 5 2 XETK S31 0 Connection to the ECU...

Page 26: ...access to the ECU NOTE The XETK Ethernet interface is compatible with the Ethernet interfaces of the ES51x ES59x ES600 ES910 module P C E S 910 P C CB E 200 3 C B AE 200 2 1 m20 C B AE 330 2 0 m5 Lem...

Page 27: ...U The XETK S31 0 does not require a galvanically isolated power supply For spe cial applications ETAS offers the isolated power supply ETP2 Fig 5 6 Isolated Power Supply inside ECU ECU 12V ECU GND Per...

Page 28: ...input exists these inputs can be downloaded from this database If necessary a plausibility check is performed B Connection of the XETK to the ECU The ECU hardware developer defines the connection of t...

Page 29: ...he help document of the X ETK Configuration Tool Starting the XCT Tool help 1 Start the XCT Tool The main window of the XCT tool opens 2 Select in the menu bar Contents 3 The XCT Tool help window open...

Page 30: ...45 connection is required Ethernet interfaces that are implemented with an additional network card in the PC must feature a 32 bit data bus 7 1 2 1 Requirement to ensure successful Initialization of...

Page 31: ...rement Calibration ECU Flash Programming Microcontroller INCA INCA MCE HSP ETK Tools MPC5744K ED SPC EMU574K72 V7 1 7 V2 0 V10 7 0 V4 0 3 MPC5746M ED SPC EMU57EM80 V7 1 7 V2 0 V10 7 0 V4 0 3 MPC5777A...

Page 32: ...CET HSP Method MPC5744K ED SPC EMU574K72 V4 6 V6 4 V10 11 SBB V2 1 V4 5 V6 3 V10 7 HBB DISTAB13 MPC5746M ED SPC EMU57EM80 V4 6 V6 4 V10 11 SBB V2 1 V4 5 V6 3 V10 7 HBB DISTAB13 MPC5777M ED SPC EMU57HM...

Page 33: ...x 32 KByte Yes EMU574K72xy 1 Mbyte 32 x 32 KByte Yes MPC5746M ED 1 Mbyte 32 x 32 KByte Yes EMU57EM80xy 1 Mbyte 32 x 32 KByte Yes MPC5777M ED 2 Mbyte 32 x 64 KByte Yes EMU57HM90xy 2 Mbyte 32 x 64 KByt...

Page 34: ...r 7 1 2 on page 30 Item Characteristics Temperature range operation 40 C to 110 C 40 F to 230 F Temperature range storage 0 C to 50 C 18 F to 122 F Relative humidity non condensing 0 to 95 Operating a...

Page 35: ...UBatt 12 V I 0 mA at pin ECU_SBRAM T 20 C 1 62 W Power consump tion PBatt UBatt 12 V I 500 mA at pin VDDSTBY 1 25 V I 80 mA at Pin VDDPSTBY T 20 C 3 W 1 The XETK S31 0 implements reverse voltage prote...

Page 36: ...nce level of 1 5 V Output signals are mea sured with 20 pF to ground and 50 to 1 5 V Parameter Symbol Value ns Comment JTAG Clock Period ETK Target ttck 50 20 MHz Nexus JTAG Clock Frequency 25 40 MHz...

Page 37: ...0 mA Ubatt 1 V Ubatt V ECU Power Supply Supervision Voltage 3 3 V selected VDDP ECU on 2 48 2 58 2 68 V ECU off 2 33 2 43 2 53 V IDDP VDDP 3 3 V 200 A ECU Power Supply Supervision Voltage 5 0V selecte...

Page 38: ...by XETK typ pF 1 TCK XO 2 0 7 2 3 3 3 3340 2360 15 TMS XO 2 0 7 2 3 3 3 3340 2360 15 TDO I 0 8 2 5 5 40 40 15 TRST TDI XO 2 0 7 2 3 3 3 20 20 10 ESRO IXOD 3 0 7 0 8 2 5 5 25 20 22 PORST IXOD 3 0 7 0 8...

Page 39: ...On Reset signal open drain for Reset assertion and supervision 5 WDGDIS Output Watchdog disable Signal 8 VDDP Sense Input Sense for Switched power supply of ECU ignition 2 GND Power Signal Ground Pin...

Page 40: ...ce Millimeters Dimension Inches Tolerance Inches A 45 00 0 20 1 772 0 008 B 36 90 0 20 1 453 0 008 C 23 30 0 20 0 917 0 008 D 7 10 0 20 0 280 0 008 E 48 25 0 20 1 900 0 008 F 51 00 0 20 2 008 0 008 G...

Page 41: ...0 2 008 0 008 C 3 25 0 10 0 128 0 004 D 6 00 0 20 0 236 0 008 E 3 5 0 10 1 900 0 004 F 6 75 0 20 0 266 0 008 G 12 25 0 20 0 482 0 008 H 15 85 0 20 0 624 0 008 I 20 0 0 20 0 787 0 008 J 23 95 0 20 0 94...

Page 42: ...8 m length shield connected to socket Usable for ECUs with shielded hous ing 8 1 2 CBAM240 Adapter Cable Fig 8 2 CBAM240 Adapter Cable XETK ECU Adapter Cable 100 MBit s shield connected to ECU housing...

Page 43: ...Mbit s pre assembled into PG9 screwing shield on ECU housing Lemo 1B PHE JST PHR 10fc 5fc 0 5 m length Fits for ETKS_C3 case NOTE For mounting the cable cut a PG9 thread into the ECU housing For thin...

Page 44: ...Power Supply Cable pre assembled into PG9 screwing shield on ECU Housing Lemo 1B PHE JST PHR 10fc 5fc Lemo 0B PHG JST PAP 2fc 2fc 0 5 m and 0 7 m length NOTE For using the cable with an ETK with sold...

Page 45: ...CBAE200 2 1m20 supports Gigabit Ethernet NOTE For mounting the cable cut a PG9 thread into the ECU housing For thin walled housings use a nut SM PE 9 Available from Lapp Order number 52103210 Product...

Page 46: ...it Ethernet cable with power supply 8 4 2 CBAE330 Adapter Cable Fig 8 9 CBAE330 Adapter Cable Gigabit to 100 MBit s Ethernet Adapter for connection of CBE230 to ES600 Cable adapter to connect CBE230 c...

Page 47: ...K S31 0 User Guide 47 8 5 Power Supply Cables 8 5 1 Cable K70 1 Fig 8 10 Power Supply Cable K70 1 8 5 2 Cable KA50 Fig 8 11 Power Supply Cable KA50 Dim Millimeters Inches A 2000 78 74 Dim Millimeters...

Page 48: ...pters 8 6 1 XETK ECU Adapter ETAM2 Fig 8 12 XETK ECU Adapter ETAM2 8 6 2 XETK ECU Adapter ETAM3 Fig 8 13 XETK ECU Adapter ETAIM3 NOTE See Fig 5 2 on page 25 for details on mating connector to the ETAM...

Page 49: ...ETAS Cables and Accessories XETK S31 0 User Guide 49 8 6 3 XETK ECU Adapter ETAM5 Fig 8 14 XETK ECU Adapter ETAM5 NOTE See Fig 5 2 on page 25 for details on mating connector to the ETAM5...

Page 50: ...e JDP MPC57xx microprocessor family List Content of this Package ETK Safety Advice China RoHS leaflet_Compact_cn Order Name Short Name Order Number ETAM2 XETK FETK ECU Adapter MOLEX open wires 6fc 6c...

Page 51: ...on ECU Hous ing Lemo 1B PHE JST PHR 10fc 5fc 0m50 CBAM271 0 0m5 F 00K 107 867 Order Name Short Name Order Number XETK ECU Adapter and Power Supply Cable pre assembled into PG9 screwing shield on ECU H...

Page 52: ...rnet Connection Adapter Cable 1 GBit s to 100 MBit s Lemo 1B PHE Lemo 1B FGF 10fc 8mc 0m5 CBAE330 2 0m5 F 00K 105 759 Order Name Short Name Order Number External Power Supply Cable for ETKs Lemo 0B FG...

Page 53: ...ails of your local sales office as well as your local technical support team and product hotlines take a look at the ETAS website Borsigstra e 24 Phone 49 711 3423 0 70469 Stuttgart Fax 49 711 3423 21...

Page 54: ...Permanent Power Supply inside ECU available 27 Fig 5 5 Permanent Power Supply inside ECU not available 27 Fig 5 6 Isolated Power Supply inside ECU 27 Fig 7 1 XETK S31 0 Dimensions Top View 1 40 Fig 7...

Page 55: ...ce 18 ETK Configuration 28 F Features 15 H Hardware Description 16 I Identifications on the product 11 Interface Cables 42 ECU 17 Introduction 14 Isolated Power Supply 27 L LED 20 M Measurement Data M...

Reviews: