10
www.eta.co.at
After filling Operation
After filling
As soon as the ETAbox is full
When the desired or maximum fill level has been
reached, stop filling. Switch off the suction blower
and remove both hoses (filling hose, suction hose)
from the couplings.
Cover both couplings
Switch heating system back on, enter pellet level
in control system
Heating can resume immediately after filling.
Enter the ETAbox's new pellet volume into the
boiler's control system if your boiler records
pellet consumption or volume. Information
about this can be found in your boiler's operating
instructions.
Cover the couplings