Page 2: ...of symbols Important NOTICES for operation CAUTION Failure to observe these notices can result in property damage STOP Failure to observe these notices can result in personal injury Warranty guarante...

Page 3: ...vent damage that neither you nor we wish to occur Training the customer To avoid errors in operation please explain to your customer preferably using this manual exactly how the ETAbox works and how i...

Page 4: ...plus A1 with a diameter of 6 to 8 mm and a length of 15 to 40 mm If the ETAbox or parts thereof are used for any other purpose no guarantee or functionality claims may be asserted The fabric sack must...

Page 5: ...the main switch on the boiler before any work on the ETAbox and the pellet conveyor system If the ETAbox has a power supply separate from that of the boiler switch that power supply off as well If th...

Page 6: ...can be adjusted to the room height in increments of 100 mm ETAbox 17 Length x width 1 700 x 1 700 mm Height adjustable in increments of 100 mm 1 800 to 2 500 mm Volume 3 1 to 5 0 m Weight with pellet...

Page 7: ...e conveyor screw The vacuum pump continues to run factory setting of 10 seconds for an ETA boiler to empty the pellet hoses Check fill level The fill level of the ETAbox can be determined by feeling t...

Page 8: ...pen a window to ensure the necessary air flow into the room If the room has no window of its own you can open a door to establish a connection to a room with an open window Use suction During filling...

Page 9: ...heck fill level regularly Check the fill level regularly to prevent overfilling Do not overfill the ETAbox The current fill level can be determined by looking through the inspection ports or by feel s...

Page 10: ...lling hose suction hose from the couplings Cover both couplings Switch heating system back on enter pellet level in control system Heating can resume immediately after filling Enter the ETAbox s new p...

Page 11: ...nozzles on fuel conveying system Pellet hoses leak Conveyor screw transports too many pellets Leak in pellet bin on boiler Non return flap in pellet bin on boiler is dirty ETA boilers have no non retu...

Page 12: ...the discharge conveyor Use a long pointed object such as a screwdriver to loosen the pellets and remove them Possibly also remove the back air hose to make poking easier Verify whether conveyor screw...

Page 13: ...the screw disconnect power supply Stop heating and use the mains switch to switch off the boiler If the ETAbox has a separate power supply discon nect it from the mains as well Detach cover on dischar...

Page 14: ...crews Pull the screw slowly out of the discharge conveyor Removing foreign objects Remove foreign objects from the discharge conveyor or the screw Insert screw into discharge conveyor Slowly insert th...

Page 15: ...rge conveyor Remove both barrier plates from the discharge conveyor and store them in the immediate vicinity of the ETAbox Attach cover Attach the cover to the discharge conveyor with 2 M8 x 25 hex he...

Page 16: ...hat you keep records about all service and maintenance work as well as malfunctions These records can be entered in the following pages Then you and our customer service will always have an overview o...

Page 17: ...17 2012 10 Maintenance and service records ETAbox Operation Date Performed by Service maintenance cleaning Work performed parts replaced...

Page 18: ...18 www eta co at Maintenance and service records Date Performed by Service maintenance cleaning Work performed parts replaced...

Page 19: ...19 2012 10 Maintenance and service records ETAbox Operation Date Performed by Service maintenance cleaning Work performed parts replaced...

Page 20: ...iler is equipped with a draught fan and ventilated rotary valve to protect against back burning Only fill ETAbox at underpressure While injecting pellets extract more air from the ETAbox than is blown...

Reviews: